What's changing near HP12 3JG
Within 2 km, around Oakridge & Castlefield in Buckinghamshire. Building, planning, schools, transport, prices and crime.
51new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.2%like-for-like prices in Oakridge & Castlefield, 2024 → 2025 (council +2.0%)
+7%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedflats · Sep 2026
Oct 2026
900 m away - New homes
14 new homes completedflats · Dec 2024
Jan 2025
1.9 km away - New homes
9 new homes completedflats · Nov 2024
Nov 2024
450 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 13 postcodes nearby had new homes completed in the last two years.
19homes extended 2021–2025, typically adding 34 m²
44since energy certificates began (2008)
1in HP12 3JG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
14 planned, approved or being built and 2 running (42 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Newlands Meadow, Eden - Solar PanelsApproved, not yet built · 150 kW
Aug 2022
1.8 km away - Rooftop solar
Eden Shopping Centre, Oxford Road - Solar PanelsApproved, not yet built · 630 kW
Sept 2023
1.8 km away - Rooftop solar
Wycombe Leisure Centre, Handy Cross - Solar PanelsApproved, not yet built · 500 kW
Dec 2024
1.9 km away - Rooftop solar
Big Yellow Self Storage, London Road - Solar PanelsApproved, not yet built · 180 kW
Sept 2024
3.6 km away - Battery storage
Derehams Farm, Derehams Lane - Battery StoragePlanning application in · 126 MW
Nov 2023
6.2 km away - Rooftop solar
Globe Business Park, Fieldhouse Lane - PV PanelsApproved, not yet built
Jan 2023
6.3 km away - Rooftop solar
Holmer Green Senior School - Solar PanelsApproved, not yet built · 180 kW
Sept 2024
7.2 km away - Rooftop solar
David Lloyd Leisure Group - Solar PV SystemApproved, not yet built
Aug 2023
7.5 km away - Rooftop solar
Thomas Road, Wooburn Industrial Estate - Solar PanelsApproved, not yet built · 420 kW
Nov 2023
7.9 km away - Battery storage
Mop End Farm, Mop End Lane - Battery Energy StoragePlanning application in · 500 MW
Aug 2025
9.0 km away
Road and street works within 1 km
13 permitted works running now or planned, 4 of them major.
- Major, planned
New Road, High WycombeHighway improvement works · Buckinghamshire Council · Road closure
Jan 2027 to Jan 2027
650 m away - Major
New Road, High WycombeHighway improvement works · Buckinghamshire Council · Road closure
Nov 2026 to Dec 2026
650 m away - Major, planned
Gallows Lane, High WycombeHighway improvement works · Buckinghamshire Council · Road closure
Jul 2027 to Aug 2027
800 m away - Major
Fernie Fields, High WycombeUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Jan 2027 to Feb 2027
1000 m away - Standard
New Road, High WycombeNew service connection · THAMES WATER · Multi-way signals
Oct 2026 to Oct 2026
500 m away - Minor
Chiltern Avenue, High WycombeUtility asset works · THAMES WATER · No carriageway incursion
Dec 2026 to Dec 2026
150 m away - Minor
Spearing Road, High WycombeUtility asset works · THAMES WATER · No carriageway incursion
Nov 2026 to Nov 2026
350 m away - Minor
Laburnum Road, High WycombeHighway repair and maintenance works · Buckinghamshire Council · Stop/go boards
Dec 2026 to Dec 2026
400 m away - Minor
Carrington Road, High WycombeUtility asset works · THAMES WATER · Give and take
Oct 2026 to Nov 2026
450 m away - Minor
Lane End Road, High Wycombe
Major infrastructure projects within 30 km
- Pre-application
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste). application due January 2027
13.6 km away - Decideddecided Nov 2023
15.6 km away - Decideddecided Sept 2016
15.7 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
26.2 km away - Pre-applicationapplication due December 2027
28.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: High Heavens Landfill (landfill gas, 3.2 km); Derehams Farm, Derehams Lane - Battery Storage (battery storage, 6.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.