Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Manor Gardens, Wooburn GreenUtility asset works · THAMES WATER · No carriageway incursion
Nov 2026 to Nov 2026 400 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste).
application due January 2027 6.2 km away
Decided
Slough Multifuel Extension ProjectGenerating Stations · Land at 342 Edinburgh Avenue, Slough Trading Estate, Slough, Berkshire, SL1 4TU.
Newlands Meadow, Eden - Solar PanelsApproved, not yet built · 150 kW
Aug 2022 6.6 km away
Rooftop solar
Eden Shopping Centre, Oxford Road - Solar PanelsApproved, not yet built · 630 kW
Sept 2023 6.6 km away
Running nearest: Derehams Farm, Derehams Lane - Battery Storage (battery storage, 2.6 km); Wapsey's Wood (landfill gas, 6.1 km); Wapsey's Wood III (landfill gas, 6.1 km); Wapsey's Wood II Landfill Site (landfill gas, 6.1 km); Iomart, Clivemont Road - Solar Panels (rooftop solar, 7.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Dams and Reservoirs · From Mogden Sewage Treatment Works to the River Thames upstream of Teddington Weir
application due March 2027 27.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.