What's changing near HD9 6HB
Within 2 km, around Honley & Brockholes in Kirklees. Building, planning, schools, transport, prices and crime.
218new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.9%like-for-like prices in Honley & Brockholes, 2024 → 2025 (council +4.0%)
-1%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedhouses · Mar 2025 – Oct 2026
planned Oct 2026
800 m away - New homes
15 new homes completedhouses · Mar 2026 – Oct 2026
planned Oct 2026
750 m away - New homes
20 new homes completedhouses · Jul 2025 – Oct 2026
Oct 2026
750 m away - New homes
17 new homes completedhouses · Jun 2026 – Oct 2026
Oct 2026
1.7 km away - New homes
14 new homes completedhouses · Dec 2024 – Sep 2026
Sept 2026
1.7 km away - New homes
16 new homes completedhouses · Nov 2025 – Jun 2026
Jun 2026
1.7 km away - New homes
26 new homes completedhouses · Nov 2024 – May 2026
May 2026
1.7 km away - New homes
11 new homes completedhouses · Dec 2024 – May 2026
May 2026
1.7 km away - New homes
11 new homes completedhouses · Nov 2025 – Apr 2026
Apr 2026
1.5 km away - New homes
15 new homes completedhouses · Dec 2025 – Apr 2026
Apr 2026
1.7 km away - New homes
20 new homes completedhouses · May 2025 – Mar 2026
Mar 2026
850 m away - New homes
7 new homes completedhouses · Oct 2025 – Dec 2025
Dec 20251.9 km away
14homes extended 2021–2025, typically adding 31 m²
23since energy certificates began (2008)
1in HD9 6HB itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
3,139hours of spills in 2025 between them (typical neighbourhood: about 36)
365spill events counted
- Yorkshire Water
Longlands Road Csointo River Holme57 spills, 1,088 hours in 2025
1.6 km away - Yorkshire Water
Neiley No. 2 Stwinto River Holme55 spills, 736 hours in 2025
650 m away - Yorkshire Water
Thirstin Road No2 Csointo Tributary Of Mag Brook60 spills, 450 hours in 2025
1.0 km away - Yorkshire Water
Queens Square Csointo River Holme62 spills, 365 hours in 2025
1.3 km away - Yorkshire Water
Honley Huddersfield Road No 2into River Holme58 spills, 305 hours in 2025
1.2 km away - Yorkshire Water
Corn Mill No 2 Csointo River Holme35 spills, 154 hours in 2025
800 m away - Yorkshire Water
Brockholes Lane Csointo Culv Trib Of River Holme9 spills, 30 hours in 2025
1.1 km away - Yorkshire Water
Honley Newtown No 2 Csointo River Holme18 spills, 9 hours in 2025
800 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
20 planned, approved or being built and 4 running (30 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Newsome Academy, Castle Avenue - Solar PanelsApproved, not yet built
Jun 2026
3.1 km away - Rooftop solar
David Brown Santasalo, Park Road - Solar PanelsApproved, not yet built · 570 kW
Oct 2022
4.2 km away - Rooftop solar
Continental Sports, Millgate - Solar PanelsApproved, not yet built · 260 kW
Apr 2023
4.8 km away - Rooftop solar
University Of Huddersfield, Queensgate - Solar PanelsApproved, not yet built · 230 kW
Nov 2025
5.1 km away - Rooftop solar
University Of Huddersfield, Queensgate - Solar PanelsApproved, not yet built · 660 kW
Feb 2023
5.1 km away - Rooftop solar
Cummins Turbo Technologies, St Andrews Road - Solar panelsApproved, not yet built · 450 kW
Jul 2024
5.6 km away - Rooftop solar
Thornton And Ross, Manchester Road - Solar Photovoltaic PanelsApproved, not yet built · 510 kW
Jul 2023
5.6 km away - Rooftop solar
Cummins Turbo Technologies, St Andrews Road - Solar PanelsApproved, not yet built · 930 kW
Jul 2023
5.7 km away - Solar farm
Cummins Turbo Technology, St Andrews Road - Solar PV CanopiesPlanning application in
Mar 2026
5.7 km away - Rooftop solar
John Smiths Stadium, Huddersfield Town - Solar PanelsApproved, not yet built · 500 kW
Sept 20256.4 km away
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
- Major, planned
Church Street, HolmfirthUtility repair and maintenance works · BT · Road closure
Nov 2026 to Nov 2026
700 m away - Minor
Banks Road, HolmfirthUtility repair and maintenance works · YORKSHIRE WATER · Two-way signals
Oct 2026 to Oct 2026
700 m away - Minor
Croft Drive, HolmfirthNew service connection · YORKSHIRE WATER · Give and take
Oct 2026 to Oct 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
21.1 km away - Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
28.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Vine Street EfW (energy from waste, 6.5 km); Blackstone Edge (wind farm, 8.2 km); Hazlehead (wind farm, 8.4 km); Spicer Hill Wind Farm (wind farm, 9.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.