Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
655hours of spills in 2025 between them (typical neighbourhood: about 36)
84spill events counted
Yorkshire Water
Springfield Lane Csointo Tributary Of Dean Bottom Dike67 spills, 595 hours in 2025
650 m away
Yorkshire Water
Damhill No 2 Csointo Shepley Dike9 spills, 34 hours in 2025
2.0 km away
Yorkshire Water
Thunderbridge No 2 Csointo Shepley Dike8 spills, 26 hours in 2025
1.8 km away
Yorkshire Water
Dogley Csointo Woodsome Beck0 spills, 0 hours in 2025
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
application due February 2028 29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Kirkburton & Farnley Tyas: +23% over five years (2020 → 2025).
Council tax list: 30 homes added in the neighbourhood since April 2024.
Population (GP registrations): -11.9% in two years.