Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
1,427hours of spills in 2025 between them (typical neighbourhood: about 36)
375spill events counted
Yorkshire Water
Bonegate Lane Csointo River Calder120 spills, 737 hours in 2025
1.9 km away
Yorkshire Water
Bonegate Lane Csointo River Calder119 spills, 463 hours in 2025
1.9 km away
Yorkshire Water
Pollard Street No 2 Csointo River Calder29 spills, 83 hours in 2025
1.7 km away
Yorkshire Water
Bramston Street Csointo River Calder34 spills, 62 hours in 2025
1.5 km away
Yorkshire Water
Bonegate Lane Csointo River Calder27 spills, 54 hours in 2025
1.9 km away
Yorkshire Water
Birds Royd Lane Csointo River Calder27 spills, 21 hours in 2025
1.7 km away
Yorkshire Water
Dyehouse Lane Csointo River Calder19 spills, 7 hours in 2025
1.8 km away
Yorkshire Water
Lillands Lane Csointo River Calder0 spills, 0 hours in 2025
36 planned, approved or being built and 1 running (10 MW between them). Those within 5 km are on the map above.
Rooftop solar
Lowfields Business Park, Lowfields Way - Solar PanelsApproved, not yet built · 620 kW
Aug 2023 2.0 km away
Battery storage
Ashday Hall Farm, Ashday Lane - Battery Energy StorageApproved, not yet built · 65 MW
Mar 2025 2.0 km away
Rooftop solar
Aflex House, Dyson Wood Way - Solar PanelsApproved, not yet built · 890 kW
Jan 2023 2.1 km away
Battery storage
Lowfields Energy Storage ProjectApproved, not yet built · 50 MW
Mar 2023 2.1 km away
Rooftop solar
Aflex Hose, Dyson Wood Way - olar PanelsApproved, not yet built · 1 MW
Jun 2024 2.2 km away
Rooftop solar
Spire Elland Hospital - Solar PanelsApproved, not yet built · 180 kW
Apr 2025 2.3 km away
Rooftop solar
United Anodisers, Red Doles Lane - Solar PanelsBeing built · 310 kW
Mar 2023 3.4 km away
Rooftop solar
Huddersfield Town Sports Academy, Leeds Road - Solar PV PanelsApproved, not yet built · 150 kW
Sept 2025 3.6 km away
Rooftop solar
Ellis Hill Trading Estate, Leeds Road - Solar PanelsApproved, not yet built · 180 kW
Jul 2024 3.6 km away
Rooftop solar
Huddersfield Audi, Leeds Road - Solar PanelsApproved, not yet built · 250 kW
Dec 2025 3.7 km away
Road and street works within 1 km
8 permitted works running now or planned, 2 of them major.
Major
Malham Road, BrighouseHighway repair and maintenance works · CALDERDALE METROPOLITAN BOROUGH COUNCIL · Give and take
Sept 2026 to Dec 2026 550 m away
Major, planned
Sherburn Road, BrighouseSection 50 · CALDERDALE METROPOLITAN BOROUGH COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 800 m away
Standard
Delf Hill, BrighouseHighway improvement works · CALDERDALE METROPOLITAN BOROUGH COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 250 m away
Standard
Burnsall Road, BrighouseUtility asset works · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Oct 2026 to Oct 2026 650 m away
Standard
Burnsall Road Footpath 2, BrighouseUtility repair and maintenance works · NORTHERN POWERGRID (YORKSHIRE) PLC · No carriageway incursion
Oct 2026 to Oct 2026 700 m away
Standard
Highfield Road, BrighouseUtility asset works · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Oct 2026 to Oct 2026 750 m away
Standard
Burnsall Road Footpath 3, BrighouseUtility asset works · NORTHERN POWERGRID (YORKSHIRE) PLC · No carriageway incursion
Oct 2026 to Oct 2026 800 m away
Minor
Ogden Lane, BrighouseUtility repair and maintenance works · YORKSHIRE WATER · Multi-way signals
Oct 2026 to Oct 2026 500 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Rastrick West: +28% over five years (2020 → 2025).
Council tax list: 190 homes added in the neighbourhood since April 2024.
Population (GP registrations): +3.6% in two years.