What's changing near HD6 2NS
Within 2 km, around Brighouse in Calderdale. Building, planning, schools, transport, prices and crime.
98new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+10.8%like-for-like prices in Brighouse, 2024 → 2025 (council +4.8%)
+8%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
25 new homes completedhouses · Jul 2025 – Aug 2026
Aug 2026
1.2 km away - New homes
5 new homes completedflats · Jun 2026
Jun 2026
1.8 km away - New homes
14 new homes completedhouses · Apr 2026 – May 2026
May 2026
1.1 km away - New homes
11 new homes completedhouses · Mar 2025 – Jan 2026
Jan 2026
1.5 km away - New homes
12 new homes completedhouses · Mar 2025 – Aug 2025
Aug 2025
1.5 km away - New homes
16 new homes completedhouses · Aug 2025
Aug 2025
1.5 km away - New homes
5 new homes completedflats · Mar 2025
Mar 2025
1.7 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 13 postcodes nearby had new homes completed in the last two years.
11homes extended 2021–2025, typically adding 22 m²
19since energy certificates began (2008)
1in HD6 2NS itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
11storm overflows within 2 km
1,347hours of spills in 2025 between them (typical neighbourhood: about 36)
449spill events counted
- Yorkshire Water
Wyke Beck Csointo Bottom Hall Beck72 spills, 357 hours in 2025
1.5 km away - Yorkshire Water
Red Lion A58 Csointo Wyke Beck73 spills, 257 hours in 2025
2.0 km away - Yorkshire Water
Bailiff Bridge Csointo Wyke Beck66 spills, 244 hours in 2025
950 m away - Yorkshire Water
Coley Beck Csointo Not Matched In Ea Consents Database50 spills, 173 hours in 2025
1.9 km away - Yorkshire Water
Wyke Old Lane Csointo Clifton Beck48 spills, 96 hours in 2025
1.5 km away - Yorkshire Water
Bramston Street Csointo River Calder34 spills, 62 hours in 2025
2.0 km away - Yorkshire Water
Bailiff Bridge Csointo Wyke Beck32 spills, 55 hours in 2025
1.8 km away - Yorkshire Water
Hoyle House Bridge Csointo Clifton Beck27 spills, 47 hours in 2025
1.2 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
49 planned, approved or being built and 1 running (10 MW between them). Those within 5 km are on the map above.
- Battery storage
Ashday Hall Farm, Ashday Lane - Battery Energy StorageApproved, not yet built · 65 MW
Mar 2025
2.4 km away - Rooftop solar
Lowfields Business Park, Lowfields Way - Solar PanelsApproved, not yet built · 620 kW
Aug 2023
3.0 km away - Battery storage
Lowfields Energy Storage ProjectApproved, not yet built · 50 MW
Mar 2023
3.2 km away - Rooftop solar
Appleton Academy, Woodside Road - Solar PanelsApproved, not yet built · 230 kW
Nov 2024
3.4 km away - Rooftop solar
Spire Elland Hospital - Solar PanelsApproved, not yet built · 180 kW
Apr 2025
3.7 km away - Rooftop solar
Eureka, Discovery Road - Solar PanelsApproved, not yet built · 180 kW
Apr 2024
4.0 km away - Rooftop solar
Sainsburys, Wade Street - Solar PanelsApproved, not yet built · 840 kW
Jun 2026
4.2 km away - Battery storage
Stainland Road, Salterhebble - Battery Storage FacilityApproved, not yet built · 25 MW
Sept 2021
4.6 km away - Rooftop solar
Aflex House, Dyson Wood Way - Solar PanelsApproved, not yet built · 890 kW
Jan 2023
4.6 km away - Rooftop solar
Aflex Hose, Dyson Wood Way - olar PanelsApproved, not yet built · 1 MW
Jun 2024
4.7 km away
Road and street works within 1 km
11 permitted works running now or planned, 10 of them major.
- Major
Smith House Crescent, BrighouseUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Sept 2026 to Oct 2026
400 m away - Major
Smith House Avenue, BrighouseUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Sept 2026 to Nov 2026
450 m away - Major, planned
Sycamore Drive, BrighouseUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Mar 2027 to Apr 2027
950 m away - Major
Sycamore Drive, BrighouseUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Mar 2027 to Apr 2027
950 m away - Major, planned
Poplar View Footpath 1, BrighouseUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Mar 2027 to Apr 2027
950 m away - Major
Poplar View Footpath 1, BrighouseUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Mar 2027 to Apr 2027
950 m away - Major, planned
Poplar View, BrighouseUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Mar 2027 to Apr 2027
950 m away - Major
Poplar View, BrighouseUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Mar 2027 to Apr 2027
950 m away - Major, planned
Poplar View Footpath 4, Brighouse
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
19.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.