Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
13storm overflows within 2 km
1,914hours of spills in 2025 between them (typical neighbourhood: about 36)
564spill events counted
Yorkshire Water
Bonegate Lane Csointo River Calder120 spills, 737 hours in 2025
300 m away
Yorkshire Water
Bonegate Lane Csointo River Calder119 spills, 463 hours in 2025
300 m away
Yorkshire Water
Bailiff Bridge Csointo Wyke Beck66 spills, 244 hours in 2025
1.6 km away
Yorkshire Water
Woodhouse Lane Csointo River Calder77 spills, 161 hours in 2025
1.2 km away
Yorkshire Water
Pollard Street No 2 Csointo River Calder29 spills, 83 hours in 2025
400 m away
Yorkshire Water
Bramston Street Csointo River Calder34 spills, 62 hours in 2025
700 m away
Yorkshire Water
Bonegate Lane Csointo River Calder27 spills, 54 hours in 2025
300 m away
Yorkshire Water
Hoyle House Bridge Csointo Clifton Beck27 spills, 47 hours in 2025
Woodhouse Lane, BrighouseUtility asset works · YORKSHIRE WATER · Road closure
Nov 2026 to Nov 2026 850 m away
Major
Gathorne Street, BrighouseUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Nov 2026 to Nov 2026 850 m away
Major
Old Lane, BrighouseUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Nov 2026 to Dec 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 21.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Clifton & Bailiff Bridge: +30% over five years (2020 → 2025).
Council tax list: 50 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.2% in two years.