Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
31storm overflows within 2 km
3,037hours of spills in 2025 between them (typical neighbourhood: about 36)
780spill events counted
Yorkshire Water
Thistle Street Csointo River Colne117 spills, 1,122 hours in 2025
29 planned, approved or being built and 1 running (10 MW between them). Those within 5 km are on the map above.
Rooftop solar
Cummins Turbo Technologies, St Andrews Road - Solar panelsApproved, not yet built · 450 kW
Jul 2024 750 m away
Rooftop solar
Cummins Turbo Technologies, St Andrews Road - Solar PanelsApproved, not yet built · 930 kW
Jul 2023 800 m away
Solar farm
Cummins Turbo Technology, St Andrews Road - Solar PV CanopiesPlanning application in
Mar 2026 800 m away
Rooftop solar
University Of Huddersfield, Queensgate - Solar PanelsApproved, not yet built · 660 kW
Feb 2023 950 m away
Rooftop solar
University Of Huddersfield, Queensgate - Solar PanelsApproved, not yet built · 230 kW
Nov 2025 1.0 km away
Rooftop solar
John Smiths Stadium, Huddersfield Town - Solar PanelsApproved, not yet built · 500 kW
Sept 2025 1.1 km away
Rooftop solar
United Anodisers, Red Doles Lane - Solar PanelsBeing built · 310 kW
Mar 2023 1.7 km away
Rooftop solar
Huddersfield Town Sports Academy, Leeds Road - Solar PV PanelsApproved, not yet built · 150 kW
Sept 2025 1.7 km away
Rooftop solar
Continental Sports, Millgate - Solar PanelsApproved, not yet built · 260 kW
Apr 2023 2.6 km away
Rooftop solar
Newsome Academy, Castle Avenue - Solar PanelsApproved, not yet built
Jun 20262.7 km away
Road and street works within 1 km
2 permitted works running now or planned.
Standard
Rydal Drive, HuddersfieldNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Dec 2026 to Dec 2026 350 m away
Minor
Old Leeds Road, HuddersfieldNew service connection · YORKSHIRE WATER · Two-way signals
Oct 2026 to Oct 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Rawthorpe: +32% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.4% in two years.