What's changing near HD2 2LW
Within 2 km, around Cowcliffe & South Fixby in Kirklees. Building, planning, schools, transport, prices and crime.
209new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-4.4%like-for-like prices in Cowcliffe & South Fixby, 2024 → 2025 (council +4.0%)
-2%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedhouses · Jan 2026 – Sep 2026
Sept 2026
1.3 km away - New homes
27 new homes completedhouses · Dec 2024 – Aug 2026
Aug 2026
1.2 km away - New homes
45 new homes completedhouses · Jan 2026 – Jul 2026
Jul 2026
1.9 km away - New homes
33 new homes completedhouses · Aug 2025 – Jun 2026
Jun 2026
1.4 km away - New homes
26 new homes completedhouses · Feb 2026 – Apr 2026
Apr 2026
1.9 km away - New homes
12 new homes completedhouses · Nov 2024 – Nov 2025
Nov 2025
1.1 km away - New homes
5 new homes completedhouses · Nov 2024 – Sep 2025
Sept 2025
1.2 km away - New homes
13 new homes completedhouses · Feb 2025 – Aug 2025
Aug 2025
1.3 km away - New homes
12 new homes completedhouses · Oct 2024 – Jun 2025
Jun 2025
400 m away - New homes
12 new homes completedhouses · Oct 2024 – Mar 2025
Mar 2025
400 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 19 postcodes nearby had new homes completed in the last two years.
10homes extended 2021–2025, typically adding 42 m²
19since energy certificates began (2008)
0in HD2 2LW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
1,285hours of spills in 2025 between them (typical neighbourhood: about 36)
176spill events counted
- Yorkshire Water
Thistle Street Csointo River Colne117 spills, 1,122 hours in 2025
2.0 km away - Yorkshire Water
Red Doles Road Csointo River Colne44 spills, 109 hours in 2025
1.9 km away - Yorkshire Water
Bradley Mills Road Spsinto River Colne3 spills, 37 hours in 2025
1.9 km away - Yorkshire Water
Yws Unknown Sites Defaultinto Varies With Outlet4 spills, 14 hours in 2025
1.6 km away - Yorkshire Water
Deveron Grove No 2 Csointo Clayton Dike7 spills, 3 hours in 2025
1.9 km away - Yorkshire Water
Castlegate Bradford Csointo Culv Trib Of Hebble Beck1 spills, 1 hours in 2025
1.8 km away - Yorkshire Water
Crescent Road Csointo Tributary Of Grimscar Dike0 spills, 0 hours in 2025
1.3 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
30 planned, approved or being built and 1 running (10 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Aflex House, Dyson Wood Way - Solar PanelsApproved, not yet built · 890 kW
Jan 2023
1.2 km away - Rooftop solar
Aflex Hose, Dyson Wood Way - olar PanelsApproved, not yet built · 1 MW
Jun 2024
1.4 km away - Rooftop solar
United Anodisers, Red Doles Lane - Solar PanelsBeing built · 310 kW
Mar 2023
1.5 km away - Rooftop solar
Huddersfield Town Sports Academy, Leeds Road - Solar PV PanelsApproved, not yet built · 150 kW
Sept 2025
1.8 km away - Rooftop solar
John Smiths Stadium, Huddersfield Town - Solar PanelsApproved, not yet built · 500 kW
Sept 2025
2.0 km away - Rooftop solar
Ellis Hill Trading Estate, Leeds Road - Solar PanelsApproved, not yet built · 180 kW
Jul 2024
2.2 km away - Rooftop solar
Huddersfield Audi, Leeds Road - Solar PanelsApproved, not yet built · 250 kW
Dec 2025
2.4 km away - Solar farm
Cummins Turbo Technology, St Andrews Road - Solar PV CanopiesPlanning application in
Mar 2026
2.5 km away - Rooftop solar
Cummins Turbo Technologies, St Andrews Road - Solar PanelsApproved, not yet built · 930 kW
Jul 2023
2.5 km away - Rooftop solar
Cummins Turbo Technologies, St Andrews Road - Solar panelsApproved, not yet built · 450 kW
Jul 20242.6 km away
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
- Major, planned
Ashbrow Road, HuddersfieldNew service connection · YORKSHIRE WATER · Road closure
Oct 2026 to Oct 2026
600 m away - Standard
Service Road Fronting 333 To 381 Bradford Road, HuddersfieldNew service connection · NORTHERN GAS NETWORKS · Some carriageway incursion
Oct 2026 to Oct 2026
650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
23.1 km away - Decideddecided Nov 2022
27.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.