Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
55hours of spills in 2025 between them (typical neighbourhood: about 36)
34spill events counted
Yorkshire Water
Burn Road Csointo Grimescar Dike23 spills, 38 hours in 2025
700 m away
Yorkshire Water
Yws Unknown Sites Defaultinto Varies With Outlet4 spills, 14 hours in 2025
1.8 km away
Yorkshire Water
Deveron Grove No 2 Csointo Clayton Dike7 spills, 3 hours in 2025
1.2 km away
Yorkshire Water
Crescent Road Csointo Tributary Of Grimscar Dike0 spills, 0 hours in 2025
29 planned, approved or being built and 1 running (10 MW between them). Those within 5 km are on the map above.
Rooftop solar
Huddersfield Royal Infirmary, Acre Street - Solar PanelsApproved, not yet built · 180 kW
Mar 2026 1.1 km away
Rooftop solar
Yorkshire Building Society, Plover Road - Solar PanelsApproved, not yet built · 170 kW
Jul 2023 1.5 km away
Rooftop solar
Continental Sports, Millgate - Solar PanelsApproved, not yet built · 260 kW
Apr 2023 2.6 km away
Rooftop solar
United Anodisers, Red Doles Lane - Solar PanelsBeing built · 310 kW
Mar 2023 2.8 km away
Solar farm
Cummins Turbo Technology, St Andrews Road - Solar PV CanopiesPlanning application in
Mar 2026 2.9 km away
Rooftop solar
Cummins Turbo Technologies, St Andrews Road - Solar PanelsApproved, not yet built · 930 kW
Jul 2023 2.9 km away
Rooftop solar
John Smiths Stadium, Huddersfield Town - Solar PanelsApproved, not yet built · 500 kW
Sept 2025 2.9 km away
Rooftop solar
Cummins Turbo Technologies, St Andrews Road - Solar panelsApproved, not yet built · 450 kW
Jul 2024 2.9 km away
Rooftop solar
Spire Elland Hospital - Solar PanelsApproved, not yet built · 180 kW
Apr 2025 3.0 km away
Rooftop solar
University Of Huddersfield, Queensgate - Solar PanelsApproved, not yet built · 230 kW
Nov 20253.1 km away
Road and street works within 1 km
16 permitted works running now or planned, 16 of them major.
Major, planned
Broombank, HuddersfieldUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Nov 2026 250 m away
Major, planned
Wood View, HuddersfieldUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Dec 2026 350 m away
Major, planned
Footpath Between 23/24 Wood View, HuddersfieldUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Dec 2026 400 m away
Major, planned
Footpath To Rear Of 109-119 Norwood Road/21/23 Clay Butts, HuddersfieldUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Dec 2026 450 m away
Major, planned
Clay Butts, HuddersfieldUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Dec 2026 500 m away
Major, planned
Norwood Road, HuddersfieldUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Feb 2027 550 m away
Major, planned
Beechfield Road, HuddersfieldUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Feb 2027 to Mar 2027 850 m away
Major, planned
Storths Road, HuddersfieldUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Jan 2027 to Feb 2027 850 m away
Major, planned
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Cowcliffe & South Fixby: +25% over five years (2020 → 2025).
Council tax list: 30 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.0% in two years.