Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
24storm overflows within 2 km
3,613hours of spills in 2025 between them (typical neighbourhood: about 36)
775spill events counted
Yorkshire Water
Thistle Street Csointo River Colne117 spills, 1,122 hours in 2025
1.2 km away
Yorkshire Water
Huddersfield Stwinto River Calder & River Colne82 spills, 781 hours in 2025
1.6 km away
Yorkshire Water
Huddersfield Stwinto River Calder & River Colne72 spills, 369 hours in 2025
1.1 km away
Yorkshire Water
Dalton Ici North No 2 Csointo Lees Head Beck65 spills, 326 hours in 2025
33 planned, approved or being built and 1 running (10 MW between them). Those within 5 km are on the map above.
Rooftop solar
Huddersfield Town Sports Academy, Leeds Road - Solar PV PanelsApproved, not yet built · 150 kW
Sept 2025 200 m away
Rooftop solar
United Anodisers, Red Doles Lane - Solar PanelsBeing built · 310 kW
Mar 2023 650 m away
Rooftop solar
Ellis Hill Trading Estate, Leeds Road - Solar PanelsApproved, not yet built · 180 kW
Jul 2024 1.0 km away
Rooftop solar
John Smiths Stadium, Huddersfield Town - Solar PanelsApproved, not yet built · 500 kW
Sept 2025 1.1 km away
Rooftop solar
Huddersfield Audi, Leeds Road - Solar PanelsApproved, not yet built · 250 kW
Dec 2025 1.2 km away
Solar farm
Cummins Turbo Technology, St Andrews Road - Solar PV CanopiesPlanning application in
Mar 2026 1.8 km away
Rooftop solar
Cummins Turbo Technologies, St Andrews Road - Solar PanelsApproved, not yet built · 930 kW
Jul 2023 1.8 km away
Rooftop solar
Aflex Hose, Dyson Wood Way - olar PanelsApproved, not yet built · 1 MW
Jun 2024 1.8 km away
Rooftop solar
Aflex House, Dyson Wood Way - Solar PanelsApproved, not yet built · 890 kW
Jan 2023 1.8 km away
Rooftop solar
Cummins Turbo Technologies, St Andrews Road - Solar panelsApproved, not yet built · 450 kW
Jul 20241.9 km away
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
Major
Whitacre Street, HuddersfieldOptional permit (no fee) e.g. for traffic management etc · NETWORK RAIL · Road closure
Feb 2025 to Jan 2027 900 m away
Minor
Leeds Road, HuddersfieldRemedial works · YORKSHIRE WATER · Some carriageway incursion
Oct 2026 to Oct 2026 250 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Huddersfield Leeds Road & Fartown: +37% over five years (2020 → 2025).
Council tax list: 110 homes added in the neighbourhood since April 2024.
Population (GP registrations): +2.3% in two years.