Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
14storm overflows within 2 km
2,229hours of spills in 2025 between them (typical neighbourhood: about 36)
460spill events counted
Yorkshire Water
Huddersfield Stwinto River Calder & River Colne82 spills, 781 hours in 2025
1.1 km away
Yorkshire Water
Huddersfield Stwinto River Calder & River Colne60 spills, 372 hours in 2025
600 m away
Yorkshire Water
Huddersfield Stwinto River Calder & River Colne72 spills, 369 hours in 2025
1.5 km away
Yorkshire Water
Huddersfield Stwinto River Calder & River Colne40 spills, 231 hours in 2025
600 m away
Yorkshire Water
Woodhouse Lane Csointo River Calder77 spills, 161 hours in 2025
1.8 km away
Yorkshire Water
Bog Green Laneinto River Colne54 spills, 149 hours in 2025
40 planned, approved or being built and 1 running (10 MW between them). Those within 5 km are on the map above.
Rooftop solar
Huddersfield Audi, Leeds Road - Solar PanelsApproved, not yet built · 250 kW
Dec 2025 1.3 km away
Rooftop solar
Ellis Hill Trading Estate, Leeds Road - Solar PanelsApproved, not yet built · 180 kW
Jul 2024 1.4 km away
Rooftop solar
Aflex Hose, Dyson Wood Way - olar PanelsApproved, not yet built · 1 MW
Jun 2024 1.6 km away
Rooftop solar
Aflex House, Dyson Wood Way - Solar PanelsApproved, not yet built · 890 kW
Jan 2023 1.8 km away
Rooftop solar
Huddersfield Town Sports Academy, Leeds Road - Solar PV PanelsApproved, not yet built · 150 kW
Sept 2025 2.6 km away
Rooftop solar
Wesco Aircraft Emea, Leeds Road - Solar PhotovoltaicApproved, not yet built · 340 kW
Apr 2024 2.7 km away
Rooftop solar
United Anodisers, Red Doles Lane - Solar PanelsBeing built · 310 kW
Mar 2023 2.9 km away
Rooftop solar
John Smiths Stadium, Huddersfield Town - Solar PanelsApproved, not yet built · 500 kW
Sept 2025 3.5 km away
Battery storage
Station Road - Energy Storage FacilityApproved, not yet built
Mar 2022 4.1 km away
Solar farm
Cummins Turbo Technology, St Andrews Road - Solar PV CanopiesPlanning application in
Mar 2026 4.2 km away
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
Major
Cooper Bridge Road, BrighouseWorks for Rail Purposes · NETWORK RAIL · Road closure
Oct 2026 to Oct 2026 750 m away
Minor
Dalton Bank Road, HuddersfieldUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Nov 2026 to Nov 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 24.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Bradley & North Fixby: +42% over five years (2020 → 2025).
Council tax list: 90 homes added in the neighbourhood since April 2024.
Population (GP registrations): +2.8% in two years.