What's changing near HD2 1QD
Within 2 km, around Bradley & North Fixby in Kirklees. Building, planning, schools, transport, prices and crime.
56new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+16.5%like-for-like prices in Bradley & North Fixby, 2024 → 2025 (council +4.0%)
-8%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedhouses · Jan 2026 – Sep 2026
Sept 2026
1.2 km away - New homes
33 new homes completedhouses · Aug 2025 – Jun 2026
Jun 2026
1.2 km away - New homes
13 new homes completedhouses · Feb 2025 – Aug 2025
Aug 2025
1.3 km away - School closed
School closed: Mill Cottage Montessori SchoolOther independent school, other independent school (closure)
Dec 2022
1.4 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
5homes extended 2021–2025, typically adding 32 m²
11since energy certificates began (2008)
1in HD2 1QD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
14storm overflows within 2 km
2,264hours of spills in 2025 between them (typical neighbourhood: about 36)
479spill events counted
- Yorkshire Water
Huddersfield Stwinto River Calder & River Colne82 spills, 781 hours in 2025
1.6 km away - Yorkshire Water
Huddersfield Stwinto River Calder & River Colne60 spills, 372 hours in 2025
1.1 km away - Yorkshire Water
Huddersfield Stwinto River Calder & River Colne72 spills, 369 hours in 2025
1.8 km away - Yorkshire Water
Huddersfield Stwinto River Calder & River Colne40 spills, 231 hours in 2025
1.1 km away - Yorkshire Water
Woodhouse Lane Csointo River Calder77 spills, 161 hours in 2025
1.2 km away - Yorkshire Water
Bog Green Laneinto River Colne54 spills, 149 hours in 2025
1.5 km away - Yorkshire Water
Bradley Leeds Road Csointo Cinderfield Dike45 spills, 140 hours in 2025
1.1 km away - Yorkshire Water
River Street Csointo River Calder19 spills, 35 hours in 2025
1.5 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
36 planned, approved or being built and 1 running (10 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Aflex Hose, Dyson Wood Way - olar PanelsApproved, not yet built · 1 MW
Jun 2024
900 m away - Rooftop solar
Aflex House, Dyson Wood Way - Solar PanelsApproved, not yet built · 890 kW
Jan 2023
1.1 km away - Rooftop solar
Ellis Hill Trading Estate, Leeds Road - Solar PanelsApproved, not yet built · 180 kW
Jul 2024
1.6 km away - Rooftop solar
Huddersfield Audi, Leeds Road - Solar PanelsApproved, not yet built · 250 kW
Dec 2025
1.6 km away - Rooftop solar
Huddersfield Town Sports Academy, Leeds Road - Solar PV PanelsApproved, not yet built · 150 kW
Sept 2025
2.4 km away - Rooftop solar
United Anodisers, Red Doles Lane - Solar PanelsBeing built · 310 kW
Mar 2023
2.6 km away - Rooftop solar
John Smiths Stadium, Huddersfield Town - Solar PanelsApproved, not yet built · 500 kW
Sept 2025
3.3 km away - Rooftop solar
Wesco Aircraft Emea, Leeds Road - Solar PhotovoltaicApproved, not yet built · 340 kW
Apr 2024
3.4 km away - Solar farm
Cummins Turbo Technology, St Andrews Road - Solar PV CanopiesPlanning application in
Mar 2026
4.0 km away - Rooftop solar
Cummins Turbo Technologies, St Andrews Road - Solar PanelsApproved, not yet built · 930 kW
Jul 20234.0 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
23.8 km away - Decideddecided Nov 2022
29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.