Country England and Wales › Region Yorkshire and The Humber › Council Kirklees › Neighbourhood Lockwood › Postcode HD1 3JJ What's changing near HD1 3JJ Within 2 km, around Lockwood in Kirklees. Building, planning, schools, transport, prices and crime.
79 new homes completed within 2 km, last 2 years
568 homes given permission on brownfield sites since 2021
+3.2% like-for-like prices in Lockwood, 2024 → 2025 (council +4.0%)
+1% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New school New school: Oak CofE Primary School Academy sponsor led, primary
planned Jan 2027 1.2 km away New homes 18 new homes completed houses · Nov 2025 – Feb 2026
Feb 2026 1.4 km away Planning permission Nov 2025 1.2 km away New homes 10 new homes completed houses · Oct 2025
Oct 2025 200 m away Planning permission Oct 2025 1.4 km away Planning permission Permission for 38 homes Taylor Valve Works, Dowker Street, Milnsbridge, Huddersfield, HD3 4JX (full planning permission) Aug 2025 1.9 km away Planning permission Permission for 18 homes First and Second Floors, Shopping Precinct, New Street and Albion Street, Huddersfield, HD1 2TR (full planning permission) Jul 2025 1.1 km away Planning permission Permission for 10 homes 1st floor, The Packhorse Centre, 19-31 King Street, Huddersfield, HD1 2RT (full planning permission) 31 homes extended 2021–2025, typically adding 22 m²
154 since energy certificates began (2008)
5 in HD1 3JJ itself
Extended certificate 2016 Extended certificate 2016 Extended certificate 2016 Extended certificate 2015 Extended certificate 2015 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 31 storm overflows within 2 km
1,008 hours of spills in 2025 between them (typical neighbourhood: about 36)
528 spill events counted
Yorkshire Water Milnsbridge (Market Street) Cso into Longwood Brook 55 spills, 125 hours in 2025
1.9 km away Yorkshire Water Colne Road Cso into River Colne 37 spills, 117 hours in 2025
1.7 km away Yorkshire Water Paddock Foot Cso into Culverted Trib Of River Colne 48 spills, 100 hours in 2025
400 m away Yorkshire Water Newsome Road Cso into River Colne 40 spills, 91 hours in 2025
1.3 km away Yorkshire Water Daisy Street Cso into River Colne 31 spills, 89 hours in 2025
2.0 km away Yorkshire Water Armitage Fold Cso into River Holme 54 spills, 85 hours in 2025
1.9 km away Yorkshire Water Longroyd Manch Road Cso into River Colne 47 spills, 66 hours in 2025
400 m away Yorkshire Water Factory Lane Cso into Tributary Of The River Colne 23 spills, 61 hours in 2025
1.4 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 26 planned, approved or being built and 1 running (10 MW between them). Those within 5 km are on the map above.
Rooftop solar David Brown Santasalo, Park Road - Solar Panels Approved, not yet built · 570 kW
Oct 2022 450 m away Rooftop solar Continental Sports, Millgate - Solar Panels Approved, not yet built · 260 kW
Apr 2023 450 m away Rooftop solar University Of Huddersfield, Queensgate - Solar Panels Approved, not yet built · 230 kW
Nov 2025 1.4 km away Rooftop solar Newsome Academy, Castle Avenue - Solar Panels Approved, not yet built
Jun 2026 1.4 km away Rooftop solar University Of Huddersfield, Queensgate - Solar Panels Approved, not yet built · 660 kW
Feb 2023 1.5 km away Rooftop solar Cummins Turbo Technologies, St Andrews Road - Solar panels Approved, not yet built · 450 kW
Jul 2024 1.9 km away Rooftop solar Cummins Turbo Technologies, St Andrews Road - Solar Panels Approved, not yet built · 930 kW
Jul 2023 2.0 km away Solar farm Cummins Turbo Technology, St Andrews Road - Solar PV Canopies Planning application in
Mar 2026 2.0 km away Rooftop solar Huddersfield Royal Infirmary, Acre Street - Solar Panels Approved, not yet built · 180 kW
Mar 2026 2.3 km away Rooftop solar Yorkshire Building Society, Plover Road - Solar Panels Approved, not yet built · 170 kW
Jul 2023 2.6 km away Road and street works within 1 km 11 permitted works running now or planned, 3 of them major.
Major, planned Linaker Street, Huddersfield Utility asset works · BT · Road closure
Nov 2026 to Nov 2026 400 m away Major May Street, Huddersfield Optional permit (no fee) e.g. for traffic management etc · NORTHERN GAS NETWORKS · Road closure
Nov 2026 to Jan 2027 500 m away Major Lightcliffe Road, Huddersfield Optional permit (no fee) e.g. for traffic management etc · NORTHERN GAS NETWORKS · Road closure
Nov 2026 to Dec 2026 600 m away Standard North Street, Huddersfield New service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Oct 2026 to Nov 2026 250 m away Standard Hall Avenue, Huddersfield Utility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 400 m away Standard Lockwood Road, Huddersfield New service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · No carriageway incursion
Oct 2026 to Oct 2026 500 m away Standard Lockwood Road, Huddersfield Highway repair and maintenance works · KIRKLEES COUNCIL · Two-way signals
Oct 2026 to Oct 2026 500 m away Standard Albert Street, Huddersfield Highway repair and maintenance works · KIRKLEES COUNCIL · Give and take
Oct 2026 to Oct 2026 550 m away Standard Blackmoorfoot Road, Huddersfield New service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · No carriageway incursion
Nov 2026 to Nov 2026 700 m away Major infrastructure projects within 30 km Decided decided Nov 2022 24.1 km away Pre-application Calderdale Energy Park Generating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026 24.9 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.