Within 2 km, around Hatch End North in Harrow. Building, planning, schools, transport, prices and crime.
94new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.3%like-for-like prices in Hatch End North, 2024 → 2025 (council -0.7%)
-1%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New homes
8 new homes completedflats · Apr 2026
Apr 2026 1.9 km away
New homes
14 new homes completedflats · Jan 2026 – Mar 2026
Mar 2026 1.9 km away
New homes
6 new homes completedflats · Mar 2026
Mar 2026 1.6 km away
New homes
8 new homes completedflats · Nov 2025
Nov 2025 1.6 km away
New homes
53 new homes completed8 flats, 45 houses · Nov 2025
Nov 2025 750 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
Planning applications within 500 m
14applications in the last 12 months
10approved · 2 refused
2still being decided
0net new homes in approved schemes since 2023
Application Under Consideration
8, DERWENT AVENUE, HA5 4QJFront porch and relocation of entrance to front; single storey side to rear extension; creation of first floor to bungalow to form two storey dwellinghouse; first floor side extension; two front dormers and one rear; landscaping; external alterationsHarrow PL/2178/26 · Householder
Sept 2026 500 m away
Application Under Consideration
8A, DERWENT AVENUE, HA5 4QJSingle storey rear extension: 4.50 metres deep, 3.00 metres maximum height and 2.80 metres high to the eavesHarrow PL/2315/26 · Prior Approval
Sept 2026 500 m away
Approved
6, TOWERS ROAD, HA5 4SJSingle storey side and rear extensions; alterations to raise side extension roof; external alterations; raised patio area to the rearHarrow PL/1975/26 · Householder
Jul 2026 500 m away
Refused
50, MARSWORTH AVENUE, HA5 4TTConversion of garage to habitable room; single storey rear extension; first floor side to rear extension; roof light in rear roof slope; lowering ground level towards rear garden; external alterations (Demolition of rear conservatory)Harrow PL/1636/26 · Householder
Jul 2026 400 m away
Approved
44, WOODHALL GATE, HA5 4TLReplacement of all windows and doors to the front, side and rear elevations with like-for-like timber designs, including the replacement of single glazing with double glazingHarrow PL/1176/26 · Householder
Apr 2026 500 m away
Approved
142, Albury Drive, HA5 3RGPart single storey and part double storey front and side extension with front porch and converting existing garage into habitable space.Harrow PL/0865/26 · Householder
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
25 planned, approved or being built and 3 running (3 MW between them). Those within 5 km are on the map above.
Rooftop solar
Headstone Lane - Solar PanelsApproved, not yet built · 590 kW
Oct 2024 2.2 km away
Rooftop solar
Northwood College, Maxwell Road - Solar PanelsApproved, not yet built
Jul 2023 3.0 km away
Rooftop solar
Northwood Health And Racquet Club, Ducks Hill Road - Solar Pv PanelsPlanning application in · 330 kW
Jul 2023 4.1 km away
Rooftop solar
Micro House, Bury Street - Solar ArraysApproved, not yet built
Apr 2025 4.3 km away
Rooftop solar
St Georges Shopping Centre, St Anns Road - Solar PanelsApproved, not yet built · 180 kW
Apr 2025 4.4 km away
Rooftop solar
Tesco Stores Limited, Lower High Street - Solar PanelsApproved, not yet built · 390 kW
Jan 2025 4.6 km away
Battery storage
Hilfield Lane, Aldenham - Battery Energy StorageApproved, not yet built · 170 MW
Jan 2026 6.0 km away
Rooftop solar
David Lloyd Leisure Club, Hartspring Lane - Solar PanelsApproved, not yet built · 280 kW
Sept 2025 6.1 km away
Rooftop solar
Centennial Park, Centennial Avenue - Solar PanelsApproved, not yet built · 170 kW
Feb 2025 6.1 km away
Rooftop solar
Rickmansworth School, Croxley Green - Solar PanelsApproved, not yet built · 180 kW
Feb 2023 6.3 km away
Road and street works within 1 km
9 permitted works running now or planned, 3 of them major.
Major
Woodhall Gate, PinnerUtility asset works · AFFINITY WATER - C · Road closure
Jan 2027 to Mar 2027 150 m away
Major
Marsworth Avenue, Hatch EndUtility asset works · AFFINITY WATER - C · Road closure
Mar 2027 to May 2027 500 m away
Major
Briants Close, Hatch EndUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Nov 2026 1000 m away
Standard
Wessex Drive, Hatch EndUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Nov 2026 to Dec 2026 350 m away
Standard
Towers Road, PinnerUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Oct 2026 350 m away
Standard
Hallam Gardens, Hatch EndUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Nov 2026 to Dec 2026 400 m away
Standard
Buckland Rise, PinnerHighway improvement works · LONDON BOROUGH OF HARROW · Some carriageway incursion
Oct 2026 to Oct 2026 800 m away
Minor
Albury Drive, PinnerDisconnection or alteration of supply · CADENT GAS LIMITED · No carriageway incursion
Nov 2026 to Nov 2026 350 m away
Immediate - urgent
St Thomas' Drive, Hatch EndUtility repair and maintenance works · THAMES WATER · Lane closure
Sept 2026 to Oct 2026 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste).
application due January 2027 14.8 km away
Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport
92, Grimsdyke Road, HA5 4PWMy wife and I purchased our first house in October 2024 and with it came the adjoining land on the South East side of our property (92 Grimsdyke Road, Pinner, HA5 4PW) which is adjacent to the pavement running alongside Grimsdyke Road (see title plans, ref.1, attached). We would like to extend our garden fence to include the perimeter of this extra land we own (detailed by the blue boundary lineHarrow PL/0860/26 · Householder
Mar 2026 250 m away
Approved
120, Albury Drive, HA5 3RGSingle storey front extension incorporating front porch; single storey rear extension; alteration and extension to raise roof ridge height; creation of two rear dormers with rooflights in front roof slopesHarrow PL/0699/26 · Householder
Mar 2026 350 m away
Approved
84, EVELYN DRIVE, HA5 4RWSingle storey front to side extension incorporating front porch; single storey side extension; single and two storey rear extension; external alterationsHarrow PL/0409/26 · Householder
16, MEREDITH CLOSE, HA5 4RPExtension to front bay window and replacement garage roofHarrow PL/0469/26 · Householder
Feb 2026 300 m away
Approved
14, MEREDITH CLOSE, HA5 4RPConversion of garage into habitable room including new roof; single storey infill extension to side and rearHarrow PL/0410/26 · Householder
Feb 2026 300 m away
Approved
39, EVELYN DRIVE, HA5 4RLSingle storey rear extension, Installation of roof lights in rear roof slopeHarrow PL/2687/25 · Householder
Nov 2025 250 m away
Approved
26, Towers Road, HA5 4SJExisting garage at rear of garden to be demolished and re-built to the same size and height. Side boundary walls to be re built with new design. Side gate to be replaced with new side gate.Harrow PL/2682/25 · Householder
Oct 2025 350 m away
Approved
24, Towers Road, HA5 4SJKIRIT - OutbuildingHarrow PL/2582/25 · All Other
Oct 2025 400 m away
Approved
64, Marsworth Avenue, HA5 4TTInfill extension to the existing rear extension, including demolition and reconstruction to form a new single-storey rear extension unified by a new roof. Associated works include the replacement of the existing garage and side gates, the replacement of the wooden shed, and the installation of a new gazebo within the rear garden. Additional internal and external alterations are also proposed.Harrow PL/2558/25 · Householder
Oct 2025 450 m away
Approved
24, TOWERS ROAD, HA5 4SJSingle storey front extension incorporating porch, Single and two storey side extension, Alterations to roof to form rear dormer, Roof lights in side roof slopes, External alterations (Demolition of attached garage and carport)Harrow PL/2508/25 · Householder
Sept 2025 400 m away
Approved
26, Towers Road, HA5 4SJPlanning Application Approved - REf: PL/0892/25 This application seeks to add a single story side extension to an alredy approved application. This application - Single storey side extension, internal alterations and rooflights.Harrow PL/2364/25 · Householder
Sept 2025 350 m away
Approved
7, Hallam Gardens, HA5 4PTsingle storey rear extension, part single storey side extension and demolition of detached garageHarrow PL/1996/25 · Householder
Sept 2025 450 m away
Approved
11, Hallam Gardens, HA5 4PTSingle storey rear extension, two side ground floor windows conversion of garage to living spaceHarrow PL/2037/25 · Householder
Aug 2025 450 m away
Approved
31, Towers Road, HA5 4SQFirst floor side extension and rear dormer (external alterations)Harrow PL/1942/25 · Householder
Jul 2025 350 m away
Approved
84, GRIMSDYKE ROAD, HA5 4PWSingle story glazed pergola to rearHarrow PL/1471/25 · Householder
Jun 2025 300 m away
Approved
8, TOWERS ROAD, HA5 4SJConversion of garage to habitable room, Replace garage door with window in front elevation, First floor side extension, Single and two storey rear extension, Alterations to roof to form side and rear dormers, Roof lights in side elevations, External alterations (Demolition of side extension)Harrow PL/0995/25 · Householder
May 2025 450 m away
Approved
112, ALBURY DRIVE, HA5 3RGFront porch, Conversion of garage to habitable room, Replace garage door and window with window in front elevation, Alterations to roof of garage to raise height, Single storey side to rear extension, Replacement of tiles with render on front elevation (Demolition of side extension and ground floor rear bay window) Harrow PL/1076/25 · Householder
May 2025 350 m away
Approved
26, TOWERS ROAD, HA5 4SJFront porch, Conversion of garage to habitable room, Replace garage door with window in front elevation, Single storey side extension, First floor and two storey side extension, Alterations to roof to form end gable, Roof lights in front and rear roof slopes, External alterations Harrow PL/0892/25 · Householder
Apr 2025 350 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
C P House, Otterspool Way - Solar PanelsApproved, not yet built · 280 kW
Dec 2022 6.4 km away
Rooftop solar
David Lloyd Leisure Centre - Solar PV PanelsApproved, not yet built
Oct 2025 6.6 km away
Running nearest: Mount Vernon Hospital - Solar Panels (rooftop solar, 4.3 km); Woodside Leisure Centre - Solar PV Panels (rooftop solar, 9.5 km); Elstree Film And TV Studios, Shenley Road - Solar Panels (rooftop solar, 9.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Waste Water Treatment Plants · Cross London Project
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.