Country England and Wales › Region South East › Council Waverley › Neighbourhood Farnham Town › Postcode GU9 9QR What's changing near GU9 9QR Within 2 km, around Farnham Town in Waverley. Building, planning, schools, transport, prices and crime.
123 new homes completed within 2 km, last 2 years
66 homes given permission on brownfield sites since 2021
-0.1% like-for-like prices in Farnham Town, 2024 → 2025 (council +2.3%)
+2% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 9 new homes completed houses · Aug 2026 – Oct 2026
planned Oct 2026 1.4 km away New homes 37 new homes completed 8 flats, 29 houses · Jul 2025 – Sep 2026
Sept 2026 350 m away New homes 27 new homes completed 8 flats, 19 houses · Dec 2025 – Jun 2026
Jun 2026 250 m away New homes 9 new homes completed flats · Nov 2024
Dec 2024 1.3 km away New homes 23 new homes completed flats · Nov 2024
Nov 2024 1.4 km away Planning permission Feb 2023 300 m away Planning permission Jan 2023 1.6 km away Planning permission Jul 2021 1.4 km away 15 homes extended 2021–2025, typically adding 34 m²
28 since energy certificates began (2008)
1 in GU9 9QR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
302 hours of spills in 2025 between them (typical neighbourhood: about 36)
31 spill events counted
Thames Water Farnham into Farnham Park Tributary 27 spills, 269 hours in 2025
400 m away Thames Water Waverley Lane Sps into Farnham Bourne 4 spills, 33 hours in 2025
1.9 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 14 planned, approved or being built and 5 running (16 MW between them). Those within 5 km are on the map above.
Rooftop solar Kinetrol Manufacturing,Farnham Trading Estate - Solar Panels Planning application in · 240 kW
Oct 2022 700 m away Rooftop solar David Lloyd Leisure Club, Wilkinson Way - Solar PV Panels Approved, not yet built · 330 kW
Sept 2023 900 m away Rooftop solar Brightwells Road - Solar Panels Approved, not yet built · 330 kW
Nov 2022 1.0 km away Battery storage University For The Creative Arts, Falkner Road - ASHP & Battery Storage Approved, not yet built
Mar 2024 1.5 km away Rooftop solar University For The Creative Arts, Falkner Road - Solar PV Panels Approved, not yet built · 570 kW
Sept 2023 1.5 km away Battery storage Crondall Road, Crondall - Fleet Bramley Battery Energy Storage Approved, not yet built · 100 MW
Aug 2025 6.1 km away Rooftop solar Farnborough International Exhibition Centre, Etps Road - Solar Panels Being built · 1 MW
Feb 2024 6.6 km away Battery storage Blue Bell Lodge, Rye Common Lane - Battery Storage Approved, not yet built · 50 MW
May 2023 7.0 km away Battery storage Rye Common Approved, not yet built · 50 MW
Sept 2021 7.0 km away Solar farm Templer Avenue - Solar Photovoltaic Panel Approved, not yet built · 230 kW
Dec 2022 7.1 km away Road and street works within 1 km 5 permitted works running now or planned, 4 of them major.
Major, planned Stoke Hills, Farnham Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Nov 2026 to Feb 2027 450 m away Major, planned Farnham Park Townpath, Farnham Highway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 550 m away Major Farnham Park Townpath, Farnham Highway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 550 m away Major, planned St James Terrace, Farnham Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Nov 2026 to Feb 2027 550 m away Minor High Park Road, Farnham Highway repair and maintenance works · SURREY COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 950 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2020 11.8 km away Decided decided May 2022 25.9 km away Decided decided Sept 2016 29.7 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Runfold Landfill (landfill gas, 1.6 km); Farnham Landfill (landfill gas, 4.1 km); Marsh House Solar Park (solar farm, 4.7 km); Farnborough Airport - Solar Panels (rooftop solar, 7.0 km); Hungerford Farm (solar farm, 9.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.