What's changing near GU9 9QD
Within 2 km, around Farnham Town in Waverley. Building, planning, schools, transport, prices and crime.
115new homes completed within 2 km, last 2 years
77homes given permission on brownfield sites since 2021
-0.1%like-for-like prices in Farnham Town, 2024 → 2025 (council +2.3%)
+2%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedhouses · Aug 2026 – Oct 2026
Oct 2026
1.1 km away - New homes
37 new homes completed8 flats, 29 houses · Jul 2025 – Sep 2026
Sept 2026
650 m away - New homes
27 new homes completed8 flats, 19 houses · Dec 2025 – Jun 2026
Jun 2026
550 m away - New homes
9 new homes completedflats · Nov 2024
Dec 2024
1.1 km away - New homes
23 new homes completedflats · Nov 2024
Nov 2024
1.1 km away - Planning permissionJun 2023
1.9 km away - Planning permissionFeb 2023
550 m away - Planning permissionJan 20231.3 km away
21homes extended 2021–2025, typically adding 35 m²
39since energy certificates began (2008)
5in GU9 9QD itself
- Extendedcertificate 2025
- Extendedcertificate 2022
- Extendedcertificate 2022
- Extendedcertificate 2022
- Extendedcertificate 2019
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
302hours of spills in 2025 between them (typical neighbourhood: about 36)
31spill events counted
- Thames Water
Farnhaminto Farnham Park Tributary27 spills, 269 hours in 2025
550 m away - Thames Water
Waverley Lane Spsinto Farnham Bourne4 spills, 33 hours in 2025
1.8 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
15 planned, approved or being built and 5 running (16 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Brightwells Road - Solar PanelsApproved, not yet built · 330 kW
Nov 2022
750 m away - Rooftop solar
Kinetrol Manufacturing,Farnham Trading Estate - Solar PanelsPlanning application in · 240 kW
Oct 2022
900 m away - Rooftop solar
David Lloyd Leisure Club, Wilkinson Way - Solar PV PanelsApproved, not yet built · 330 kW
Sept 2023
1.2 km away - Battery storage
University For The Creative Arts, Falkner Road - ASHP & Battery StorageApproved, not yet built
Mar 2024
1.3 km away - Rooftop solar
University For The Creative Arts, Falkner Road - Solar PV PanelsApproved, not yet built · 570 kW
Sept 2023
1.3 km away - Battery storage
Crondall Road, Crondall - Fleet Bramley Battery Energy StorageApproved, not yet built · 100 MW
Aug 2025
6.2 km away - Rooftop solar
Farnborough International Exhibition Centre, Etps Road - Solar PanelsBeing built · 1 MW
Feb 2024
6.9 km away - Battery storage
Rye CommonApproved, not yet built · 50 MW
Sept 2021
7.0 km away - Battery storage
Blue Bell Lodge, Rye Common Lane - Battery StorageApproved, not yet built · 50 MW
May 2023
7.0 km away - Battery storage
Coxmoor Wood, Crondall Road - Battery StorageApproved, not yet built · 57 MW
Apr 20247.3 km away
Road and street works within 1 km
12 permitted works running now or planned, 8 of them major.
- Major, planned
Stoke Hills, FarnhamUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Nov 2026 to Feb 2027
300 m away - Major, planned
St James Terrace, FarnhamUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Nov 2026 to Feb 2027
450 m away - Major, planned
Farnham Park Townpath, FarnhamHighway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026
450 m away - Major
Farnham Park Townpath, FarnhamHighway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026
450 m away - Major
East Street, FarnhamNew service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Road closure
Oct 2026 to Oct 2026
750 m away - Major
Station Hill, FarnhamWorks for Rail Purposes · NETWORK RAIL · Road closure
Oct 2026 to Oct 2026
750 m away - Major
Menin Way, FarnhamUtility asset works · BT · Road closure
Oct 2026 to Oct 2026
850 m away - Major
Castle Street, FarnhamHighway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
May 2026 to Nov 2026
850 m away - Standard
East Street, FarnhamHighway repair and maintenance works · SURREY COUNTY COUNCIL · Lane closure
Oct 2026 to Nov 2026
750 m away
Major infrastructure projects within 30 km
- Decideddecided Oct 2020
11.6 km away - Decideddecided May 2022
26.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Runfold Landfill (landfill gas, 1.7 km); Farnham Landfill (landfill gas, 3.8 km); Marsh House Solar Park (solar farm, 4.5 km); Farnborough Airport - Solar Panels (rooftop solar, 7.3 km); Hungerford Farm (solar farm, 9.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.