Country England and Wales › Region South East › Council Waverley › Neighbourhood Farnham Town › Postcode GU9 7EX What's changing near GU9 7EX Within 2 km, around Farnham Town in Waverley. Building, planning, schools, transport, prices and crime.
132 new homes completed within 2 km, last 2 years
66 homes given permission on brownfield sites since 2021
-0.1% like-for-like prices in Farnham Town, 2024 → 2025 (council +2.3%)
+2% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 6 new homes completed houses · Aug 2026 – Oct 2026
Oct 2026 250 m away New homes 7 new homes completed houses · Sep 2025 – Oct 2026
Oct 2026 800 m away New homes 37 new homes completed 8 flats, 29 houses · Jul 2025 – Sep 2026
Sept 2026 1.7 km away New homes 27 new homes completed 8 flats, 19 houses · Dec 2025 – Jun 2026
Jun 2026 1.7 km away New homes 8 new homes completed houses · Oct 2025 – Mar 2026
Mar 2026 850 m away New homes 9 new homes completed flats · Nov 2024
Dec 2024 400 m away New homes 23 new homes completed flats · Nov 2024
Nov 2024 250 m away Planning permission Feb 2023 1.7 km away Planning permission Jan 2023 750 m away 14 homes extended 2021–2025, typically adding 38 m²
35 since energy certificates began (2008)
1 in GU9 7EX itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
269 hours of spills in 2025 between them (typical neighbourhood: about 36)
27 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 17 planned, approved or being built and 6 running (22 MW between them). Those within 5 km are on the map above.
Rooftop solar University For The Creative Arts, Falkner Road - Solar PV Panels Approved, not yet built · 570 kW
Sept 2023 200 m away Battery storage University For The Creative Arts, Falkner Road - ASHP & Battery Storage Approved, not yet built
Mar 2024 200 m away Rooftop solar Brightwells Road - Solar Panels Approved, not yet built · 330 kW
Nov 2022 550 m away Rooftop solar Kinetrol Manufacturing,Farnham Trading Estate - Solar Panels Planning application in · 240 kW
Oct 2022 2.2 km away Rooftop solar David Lloyd Leisure Club, Wilkinson Way - Solar PV Panels Approved, not yet built · 330 kW
Sept 2023 2.4 km away Battery storage Crondall Road, Crondall - Fleet Bramley Battery Energy Storage Approved, not yet built · 100 MW
Aug 2025 5.5 km away Battery storage Rye Common Approved, not yet built · 50 MW
Sept 2021 6.3 km away Battery storage Blue Bell Lodge, Rye Common Lane - Battery Storage Approved, not yet built · 50 MW
May 2023 6.3 km away Battery storage Penn Croft Farm, Crondall - Battery Energy Storage Facility Approved, not yet built · 100 MW
Jan 2023 6.5 km away Battery storage Coxmoor Wood, Crondall Road - Battery Storage Approved, not yet built · 57 MW
Apr 2024 6.8 km away Road and street works within 1 km 11 permitted works running now or planned, 7 of them major.
Major West Street, Farnham Highway repair and maintenance works · SURREY COUNTY COUNCIL · Multi-way signals
Jan 2027 to Jan 2027 250 m away Major Castle Street, Farnham Highway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
May 2026 to Nov 2026 450 m away Major East Street, Farnham New service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Road closure
Oct 2026 to Oct 2026 550 m away Major Farnham By-Pass, Farnham Highway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 700 m away Major West Street, Farnham Section 50 · SURREY COUNTY COUNCIL · Multi-way signals
Oct 2026 to Nov 2026 700 m away Major Firgrove Hill, Farnham Highway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 800 m away Major Station Hill, Farnham Works for Rail Purposes · NETWORK RAIL · Road closure
Oct 2026 to Oct 2026 950 m away Standard South Street, Farnham Highway repair and maintenance works · SURREY COUNTY COUNCIL · Lane closure
Oct 2026 to Nov 2026 550 m away Standard East Street, Farnham Highway repair and maintenance works · SURREY COUNTY COUNCIL · Lane closure
Oct 2026 to Nov 2026 550 m away Major infrastructure projects within 30 km Decided decided Oct 2020 10.3 km away Decided decided May 2022 27.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Farnham Landfill (landfill gas, 2.6 km); Runfold Landfill (landfill gas, 3.0 km); Marsh House Solar Park (solar farm, 3.2 km); Farnborough Airport - Solar Panels (rooftop solar, 8.0 km); Hungerford Farm (solar farm, 9.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.