What's changing near GU9 0RH
Within 2 km, around Farnham Upper Hale in Waverley. Building, planning, schools, transport, prices and crime.
78new homes completed within 2 km, last 2 years
13homes given permission on brownfield sites since 2021
+4.8%like-for-like prices in Farnham Upper Hale, 2024 → 2025 (council +2.3%)
+4%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
37 new homes completed8 flats, 29 houses · Jul 2025 – Sep 2026
Sept 2026
1.1 km away - New homes
27 new homes completed8 flats, 19 houses · Dec 2025 – Jun 2026
Jun 2026
1.2 km away - New school
New school: Inclusion School AldershotOther independent special school, other independent special school
Mar 2026
1.8 km away - New schoolFeb 2026
1.9 km away - New homes
6 new homes completedflats · Mar 2025
Mar 2025
1.8 km away - Planning permissionFeb 2023
1.1 km away - Planning permissionJul 2021
1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
23homes extended 2021–2025, typically adding 34 m²
46since energy certificates began (2008)
2in GU9 0RH itself
- Extendedcertificate 2025
- Extendedcertificate 2014
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
269hours of spills in 2025 between them (typical neighbourhood: about 36)
27spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
15 planned, approved or being built and 6 running (22 MW between them). Those within 5 km are on the map above.
- Rooftop solar
David Lloyd Leisure Club, Wilkinson Way - Solar PV PanelsApproved, not yet built · 330 kW
Sept 2023
1.1 km away - Rooftop solar
Kinetrol Manufacturing,Farnham Trading Estate - Solar PanelsPlanning application in · 240 kW
Oct 2022
1.6 km away - Rooftop solar
Brightwells Road - Solar PanelsApproved, not yet built · 330 kW
Nov 2022
2.1 km away - Battery storage
University For The Creative Arts, Falkner Road - ASHP & Battery StorageApproved, not yet built
Mar 2024
2.3 km away - Rooftop solar
University For The Creative Arts, Falkner Road - Solar PV PanelsApproved, not yet built · 570 kW
Sept 2023
2.3 km away - Rooftop solar
Farnborough International Exhibition Centre, Etps Road - Solar PanelsBeing built · 1 MW
Feb 2024
5.4 km away - Battery storage
Crondall Road, Crondall - Fleet Bramley Battery Energy StorageApproved, not yet built · 100 MW
Aug 2025
5.4 km away - Solar farm
Templer Avenue - Solar Photovoltaic PanelApproved, not yet built · 230 kW
Dec 2022
5.8 km away - Rooftop solar
Invincible Road - Solar PanelsApproved, not yet built · 150 kW
Jun 2023
6.2 km away - Battery storage
Coxmoor Wood, Crondall Road - Battery StorageApproved, not yet built · 57 MW
Apr 20246.2 km away
Road and street works within 1 km
3 permitted works running now or planned, 3 of them major.
- Major
East Avenue, FarnhamUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Dec 2026
100 m away - Major
Farnham Park Drive, FarnhamUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Oct 2026
900 m away - Major
Hope Lane, FarnhamUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Oct 2026 to Nov 2026
1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2020
12.4 km away - Decideddecided May 2022
25.5 km away - Decideddecided Sept 2016
28.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Runfold Landfill (landfill gas, 2.4 km); Farnham Landfill (landfill gas, 5.0 km); Marsh House Solar Park (solar farm, 5.2 km); Farnborough Airport - Solar Panels (rooftop solar, 5.6 km); Hungerford Farm (solar farm, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.