Country England and Wales › Region South East › Council Hart › Neighbourhood Crookham East › Postcode GU52 8DL What's changing near GU52 8DL Within 2 km, around Crookham East in Hart. Building, planning, schools, transport, prices and crime.
163 new homes completed within 2 km, last 2 years
6 homes given permission on brownfield sites since 2021
+0.9% like-for-like prices in Crookham East, 2024 → 2025 (council +2.8%)
-23% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 16 new homes completed 3 flats, 13 houses · Apr 2025 – Jul 2026
Jul 2026 2.0 km away New homes 10 new homes completed houses · Jul 2025 – Feb 2026
Feb 2026 1.8 km away New homes 32 new homes completed flats · Nov 2024 – Jan 2026
Jan 2026 1.8 km away New homes 19 new homes completed houses · May 2025 – Jan 2026
Jan 2026 1.8 km away New homes 17 new homes completed houses · Dec 2024 – Jan 2026
Jan 2026 1.8 km away New homes 15 new homes completed houses · Jul 2025 – Jan 2026
Jan 2026 1.8 km away New homes 6 new homes completed houses · Dec 2025
Dec 2025 1.8 km away New homes 14 new homes completed houses · Nov 2024 – Sep 2025
Sept 2025 1.9 km away New homes 13 new homes completed houses · Dec 2024 – Jun 2025
Jun 2025 1.9 km away New homes 7 new homes completed 2 flats, 5 houses · Dec 2024 – Jun 2025
Jun 2025 1.9 km away Planning permission Apr 2022 1.8 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 17 postcodes nearby had new homes completed in the last two years.
11 homes extended 2021–2025, typically adding 33 m²
27 since energy certificates began (2008)
2 in GU52 8DL itself
Extended certificate 2016 Extended certificate 2014 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 27 planned, approved or being built and 6 running (22 MW between them). Those within 5 km are on the map above.
Battery storage Coxmoor Wood, Crondall Road - Battery Storage Approved, not yet built · 57 MW
Apr 2024 2.5 km away Battery storage Crondall Road, Crondall - Fleet Bramley Battery Energy Storage Approved, not yet built · 100 MW
Aug 2025 2.5 km away Battery storage Blue Bell Lodge, Rye Common Lane - Battery Storage Approved, not yet built · 50 MW
May 2023 3.3 km away Battery storage Rye Common Approved, not yet built · 50 MW
Sept 2021 3.5 km away Battery storage Penn Croft Farm, Crondall - Battery Energy Storage Facility Approved, not yet built · 100 MW
Jan 2023 4.9 km away Solar farm Templer Avenue - Solar Photovoltaic Panel Approved, not yet built · 230 kW
Dec 2022 5.1 km away Rooftop solar University For The Creative Arts, Falkner Road - Solar PV Panels Approved, not yet built · 570 kW
Sept 2023 5.2 km away Battery storage University For The Creative Arts, Falkner Road - ASHP & Battery Storage Approved, not yet built
Mar 2024 5.2 km away Rooftop solar David Lloyd Leisure Club, Wilkinson Way - Solar PV Panels Approved, not yet built · 330 kW
Sept 2023 5.3 km away Rooftop solar Farnborough International Exhibition Centre, Etps Road - Solar Panels Being built · 1 MW
Feb 2024 5.4 km away Road and street works within 1 km 2 permitted works running now or planned.
Standard Champion Way, Fleet Works for road purposes · HAMPSHIRE COUNTY COUNCIL · Give and take
Oct 2026 to Oct 2026 650 m away Minor Reading Road South, Fleet Highway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Two-way signals
Nov 2026 to Nov 2026 900 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2020 12.4 km away Decided decided Sept 2016 25.8 km away Decided decided May 2022 27.3 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Hungerford Farm (solar farm, 4.1 km); Farnborough Airport - Solar Panels (rooftop solar, 4.6 km); Taplins Farm solar park (solar farm, 4.9 km); Marsh House Solar Park (solar farm, 6.2 km); Runfold Landfill (landfill gas, 6.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.