What's changing near GU52 7TP
Within 2 km, around Fleet South & Pondtail in Hart. Building, planning, schools, transport, prices and crime.
139new homes completed within 2 km, last 2 years
5homes given permission on brownfield sites since 2021
+5.8%like-for-like prices in Fleet South & Pondtail, 2024 → 2025 (council +2.8%)
-5%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
16 new homes completedflats · Aug 2026
Aug 2026
1.3 km away - New homes
58 new homes completedhouses · Jan 2025 – Jul 2026
Jul 2026
1.7 km away - New homes
11 new homes completedflats · Mar 2026
Mar 2026
1.7 km away - New homes
26 new homes completed3 flats, 23 houses · Feb 2025 – Jan 2026
Jan 2026
1.8 km away - New homes
5 new homes completedflats · Dec 2025
Dec 2025
1.7 km away - New homes
5 new homes completedflats · Jul 2025
Jul 2025
1.7 km away - Planning permissionApr 2023
1.0 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
29homes extended 2021–2025, typically adding 38 m²
47since energy certificates began (2008)
1in GU52 7TP itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
27 planned, approved or being built and 6 running (22 MW between them). Those within 5 km are on the map above.
- Battery storage
Coxmoor Wood, Crondall Road - Battery StorageApproved, not yet built · 57 MW
Apr 2024
2.4 km away - Battery storage
Crondall Road, Crondall - Fleet Bramley Battery Energy StorageApproved, not yet built · 100 MW
Aug 2025
3.1 km away - Battery storage
Blue Bell Lodge, Rye Common Lane - Battery StorageApproved, not yet built · 50 MW
May 2023
3.6 km away - Battery storage
Rye CommonApproved, not yet built · 50 MW
Sept 2021
3.8 km away - Solar farm
Templer Avenue - Solar Photovoltaic PanelApproved, not yet built · 230 kW
Dec 2022
4.9 km away - Rooftop solar
Invincible Road - Solar PanelsApproved, not yet built · 150 kW
Jun 2023
5.3 km away - Battery storage
Penn Croft Farm, Crondall - Battery Energy Storage FacilityApproved, not yet built · 100 MW
Jan 2023
5.3 km away - Rooftop solar
Farnborough International Exhibition Centre, Etps Road - Solar PanelsBeing built · 1 MW
Feb 2024
5.4 km away - Rooftop solar
David Lloyd Leisure Club, Wilkinson Way - Solar PV PanelsApproved, not yet built · 330 kW
Sept 2023
6.4 km away - Rooftop solar
University For The Creative Arts, Falkner Road - Solar PV PanelsApproved, not yet built · 570 kW
Sept 20236.4 km away
Road and street works within 1 km
3 permitted works running now or planned.
- Standard
Champion Way, FleetWorks for road purposes · HAMPSHIRE COUNTY COUNCIL · Give and take
Oct 2026 to Oct 2026
700 m away - Minor
Reading Road South, FleetHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Two-way signals
Nov 2026 to Nov 2026
300 m away - Minor
Richmond Close, FleetWorks for road purposes · HAMPSHIRE COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2020
13.2 km away - Decideddecided Sept 2016
24.8 km away - Decideddecided May 2022
27.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Hungerford Farm (solar farm, 3.3 km); Taplins Farm solar park (solar farm, 3.9 km); Farnborough Airport - Solar Panels (rooftop solar, 4.3 km); Marsh House Solar Park (solar farm, 7.2 km); Runfold Landfill (landfill gas, 7.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.