Country England and Wales › Region South East › Council Hart › Neighbourhood Fleet West & Winchfield › Postcode GU51 5HX What's changing near GU51 5HX Within 2 km, around Fleet West & Winchfield in Hart. Building, planning, schools, transport, prices and crime.
132 new homes completed within 2 km, last 2 years
5 homes given permission on brownfield sites since 2021
+1.3% like-for-like prices in Fleet West & Winchfield, 2024 → 2025 (council +2.8%)
+1% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 16 new homes completed flats · Aug 2026
Aug 2026 1.2 km away New homes 58 new homes completed houses · Jan 2025 – Jul 2026
Jul 2026 1.4 km away New homes 11 new homes completed flats · Mar 2026
Mar 2026 1.3 km away New homes 26 new homes completed 3 flats, 23 houses · Feb 2025 – Jan 2026
Jan 2026 1.5 km away New homes 5 new homes completed flats · Dec 2025
Dec 2025 1.4 km away New homes 5 new homes completed flats · Jul 2025
Jul 2025 1.4 km away Planning permission Apr 2023 1.5 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
9 homes extended 2021–2025, typically adding 37 m²
15 since energy certificates began (2008)
0 in GU51 5HX itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
10 hours of spills in 2025 between them (typical neighbourhood: about 36)
7 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 29 planned, approved or being built and 4 running (18 MW between them). Those within 5 km are on the map above.
Battery storage Coxmoor Wood, Crondall Road - Battery Storage Approved, not yet built · 57 MW
Apr 2024 2.7 km away Battery storage Blue Bell Lodge, Rye Common Lane - Battery Storage Approved, not yet built · 50 MW
May 2023 4.1 km away Battery storage Crondall Road, Crondall - Fleet Bramley Battery Energy Storage Approved, not yet built · 100 MW
Aug 2025 4.1 km away Battery storage Rye Common Approved, not yet built · 50 MW
Sept 2021 4.3 km away Battery storage Penn Croft Farm, Crondall - Battery Energy Storage Facility Approved, not yet built · 100 MW
Jan 2023 5.7 km away Solar farm Holt Lane Solar Park Planning application in · 22 MW
May 2025 5.9 km away Rooftop solar Bartley Wood Business Park - Solar panels Approved, not yet built · 150 kW
Jul 2023 6.3 km away Solar farm Templer Avenue - Solar Photovoltaic Panel Approved, not yet built · 230 kW
Dec 2022 6.5 km away Rooftop solar Invincible Road - Solar Panels Approved, not yet built · 150 kW
Jun 2023 6.7 km away Solar farm Bunkers Hill Farm - Solar farm & Battery stations Being built · 50 MW
May 2023 6.8 km away Battery storage Road and street works within 1 km 4 permitted works running now or planned, 4 of them major.
Major, planned Elvetham Road, Fleet Highway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 350 m away Major Elvetham Road, Fleet Highway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 350 m away Major, planned Fleet Road, Hook Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Nov 2026 350 m away Major, planned Elvetham Heath Way, Fleet Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Nov 2026 400 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2020 13.9 km away Decided decided Sept 2016 23.7 km away Decided decided May 2022 28.9 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: Hungerford Farm (solar farm, 1.5 km); Taplins Farm solar park (solar farm, 1.6 km); Farnborough Airport - Solar Panels (rooftop solar, 5.9 km); Marsh House Solar Park (solar farm, 8.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.