What's changing near GU51 4QT
Within 2 km, around Fleet North, Elvetham Heath & Ancells Farm in Hart. Building, planning, schools, transport, prices and crime.
96new homes completed within 2 km, last 2 years
13homes given permission on brownfield sites since 2021
+3.7%like-for-like prices in Fleet North, Elvetham Heath & Ancells Farm, 2024 → 2025 (council +2.8%)
0%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
16 new homes completedflats · Aug 2026
Aug 2026
1.3 km away - New homes
42 new homes completedflats · Dec 2025
Dec 2025
550 m away - New homes
25 new homes completedflats · Oct 2025
Oct 2025
450 m away - Planning permissionApr 2023
1.3 km away - Planning permissionNov 2022
900 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 10 postcodes nearby had new homes completed in the last two years.
4homes extended 2021–2025, typically adding 43 m²
14since energy certificates began (2008)
0in GU51 4QT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
534hours of spills in 2025 between them (typical neighbourhood: about 36)
46spill events counted
- Thames Water
Fleet Stwinto Fleet Brook39 spills, 525 hours in 2025
1.6 km away - Thames Water
Elvetham Closeinto Basingstoke Canal7 spills, 10 hours in 2025
700 m away - Thames Water
Avondale Roadinto Fleet Brook0 spills, 0 hours in 2025
800 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
30 planned, approved or being built and 5 running (19 MW between them). Those within 5 km are on the map above.
- Battery storage
Coxmoor Wood, Crondall Road - Battery StorageApproved, not yet built · 57 MW
Apr 2024
3.6 km away - Battery storage
Crondall Road, Crondall - Fleet Bramley Battery Energy StorageApproved, not yet built · 100 MW
Aug 2025
4.8 km away - Solar farm
Templer Avenue - Solar Photovoltaic PanelApproved, not yet built · 230 kW
Dec 2022
4.9 km away - Battery storage
Blue Bell Lodge, Rye Common Lane - Battery StorageApproved, not yet built · 50 MW
May 2023
5.1 km away - Rooftop solar
Invincible Road - Solar PanelsApproved, not yet built · 150 kW
Jun 2023
5.1 km away - Battery storage
Rye CommonApproved, not yet built · 50 MW
Sept 2021
5.3 km away - Rooftop solar
Farnborough International Exhibition Centre, Etps Road - Solar PanelsBeing built · 1 MW
Feb 2024
5.6 km away - Solar farm
St Michaels Abbey, Farnborough Road - Solar PanelsApproved, not yet built · 210 kW
Apr 2026
6.2 km away - Rooftop solar
Chancerygate Way - Solar PanelsApproved, not yet built · 300 kW
May 2024
6.3 km away - Rooftop solar
Contra House, Oak Close - Solar PanelsPlanning application in · 350 kW
Jun 2026
6.5 km away - Rooftop solar
Road and street works within 1 km
8 permitted works running now or planned, 6 of them major.
- Major
Elvetham Road, FleetUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Nov 2026 to Jan 2027
200 m away - Major
Avenue Road, FleetUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Sept 2026 to Oct 2026
650 m away - Major
Church Road, FleetUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Aug 2026 to Nov 2026
650 m away - Major
Windsor Court, FleetHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026
750 m away - Major
Church Road, FleetHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2027
800 m away - Major
Albert Street, FleetHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Sept 2026 to Feb 2027
950 m away - Minor
Fleet Road, FleetWorks for road purposes · HAMPSHIRE COUNTY COUNCIL · Two-way signals
Nov 2026 to Nov 2026
300 m away - Minor
Minley Road, FleetHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026
850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2020
14.9 km away - Decideddecided Sept 2016
22.8 km away - Decideddecided May 2022
27.2 km away - Decideddecided Nov 2023
29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Running nearest: Hungerford Farm (solar farm, 3.1 km); Taplins Farm solar park (solar farm, 3.2 km); Farnborough Airport - Solar Panels (rooftop solar, 4.3 km); Marsh House Solar Park (solar farm, 9.3 km); Runfold Landfill (landfill gas, 9.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.