What's changing near GU51 3JP
Within 2 km, around Crookham East in Hart. Building, planning, schools, transport, prices and crime.
134new homes completed within 2 km, last 2 years
5homes given permission on brownfield sites since 2021
+0.9%like-for-like prices in Crookham East, 2024 → 2025 (council +2.8%)
-23%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
16 new homes completedflats · Aug 2026
Aug 2026
1.9 km away - New homes
11 new homes completedhouses · Aug 2025 – Mar 2026
Mar 2026
1.2 km away - New homes
12 new homes completedhouses · Oct 2025 – Jan 2026
Jan 2026
1.3 km away - New homes
42 new homes completedflats · Dec 2025
Dec 2025
1.7 km away - New homes
25 new homes completedflats · Oct 2025
Oct 2025
1.7 km away - New homes
11 new homes completedhouses · Aug 2025 – Oct 2025
Oct 2025
1.3 km away - Planning permissionApr 2023
1.7 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 14 postcodes nearby had new homes completed in the last two years.
7homes extended 2021–2025, typically adding 39 m²
22since energy certificates began (2008)
2in GU51 3JP itself
- Extendedcertificate 2015
- Extendedcertificate 2014
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
26 planned, approved or being built and 6 running (22 MW between them). Those within 5 km are on the map above.
- Solar farm
Templer Avenue - Solar Photovoltaic PanelApproved, not yet built · 230 kW
Dec 2022
3.6 km away - Battery storage
Coxmoor Wood, Crondall Road - Battery StorageApproved, not yet built · 57 MW
Apr 2024
3.7 km away - Rooftop solar
Invincible Road - Solar PanelsApproved, not yet built · 150 kW
Jun 2023
4.0 km away - Rooftop solar
Farnborough International Exhibition Centre, Etps Road - Solar PanelsBeing built · 1 MW
Feb 2024
4.2 km away - Battery storage
Crondall Road, Crondall - Fleet Bramley Battery Energy StorageApproved, not yet built · 100 MW
Aug 2025
4.3 km away - Battery storage
Blue Bell Lodge, Rye Common Lane - Battery StorageApproved, not yet built · 50 MW
May 2023
4.9 km away - Battery storage
Rye CommonApproved, not yet built · 50 MW
Sept 2021
5.1 km away - Solar farm
St Michaels Abbey, Farnborough Road - Solar PanelsApproved, not yet built · 210 kW
Apr 2026
5.4 km away - Rooftop solar
Chancerygate Way - Solar PanelsApproved, not yet built · 300 kW
May 2024
6.0 km away - Rooftop solar
David Lloyd Leisure Club, Wilkinson Way - Solar PV PanelsApproved, not yet built · 330 kW
Sept 2023
6.3 km away
Road and street works within 1 km
5 permitted works running now or planned, 4 of them major.
- Major, planned
Norris Hill Road, FleetHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026
700 m away - Major
Norris Hill Road, FleetHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026
700 m away - Major, planned
Ively Road, FleetHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026
850 m away - Major
Ively Road, FleetHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026
850 m away - Standard
Norris Hill Road, FleetUtility asset works · VODAFONE GROUP · Two-way signals
Oct 2026 to Oct 2026
750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2020
14.4 km away - Decideddecided Sept 2016
23.9 km away - Decideddecided May 2022
26.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Farnborough Airport - Solar Panels (rooftop solar, 3.1 km); Hungerford Farm (solar farm, 4.3 km); Taplins Farm solar park (solar farm, 4.6 km); Runfold Landfill (landfill gas, 7.6 km); Marsh House Solar Park (solar farm, 8.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.