Country England and Wales › Region South East › Council Hart › Neighbourhood Fleet North, Elvetham Heath & Ancells Farm › Postcode GU51 3FS What's changing near GU51 3FS Within 2 km, around Fleet North, Elvetham Heath & Ancells Farm in Hart. Building, planning, schools, transport, prices and crime.
118 new homes completed within 2 km, last 2 years
13 homes given permission on brownfield sites since 2021
+3.7% like-for-like prices in Fleet North, Elvetham Heath & Ancells Farm, 2024 → 2025 (council +2.8%)
0% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 16 new homes completed flats · Aug 2026
Aug 2026 900 m away New homes 11 new homes completed flats · Mar 2026
Mar 2026 1.9 km away New homes 5 new homes completed flats · Dec 2025
Dec 2025 2.0 km away New homes 42 new homes completed flats · Dec 2025
Dec 2025 800 m away New homes 25 new homes completed flats · Oct 2025
Oct 2025 700 m away New homes 5 new homes completed flats · Jul 2025
Jul 2025 2.0 km away Planning permission Apr 2023 900 m away Planning permission Nov 2022 1.3 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 14 postcodes nearby had new homes completed in the last two years.
20 homes extended 2021–2025, typically adding 37 m²
40 since energy certificates began (2008)
1 in GU51 3FS itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
10 hours of spills in 2025 between them (typical neighbourhood: about 36)
7 spill events counted
Thames Water Elvetham Close into Basingstoke Canal 7 spills, 10 hours in 2025
900 m away Thames Water Avondale Road into Fleet Brook 0 spills, 0 hours in 2025
650 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 29 planned, approved or being built and 6 running (22 MW between them). Those within 5 km are on the map above.
Battery storage Coxmoor Wood, Crondall Road - Battery Storage Approved, not yet built · 57 MW
Apr 2024 3.3 km away Battery storage Crondall Road, Crondall - Fleet Bramley Battery Energy Storage Approved, not yet built · 100 MW
Aug 2025 4.4 km away Battery storage Blue Bell Lodge, Rye Common Lane - Battery Storage Approved, not yet built · 50 MW
May 2023 4.7 km away Solar farm Templer Avenue - Solar Photovoltaic Panel Approved, not yet built · 230 kW
Dec 2022 4.8 km away Battery storage Rye Common Approved, not yet built · 50 MW
Sept 2021 4.9 km away Rooftop solar Invincible Road - Solar Panels Approved, not yet built · 150 kW
Jun 2023 5.1 km away Rooftop solar Farnborough International Exhibition Centre, Etps Road - Solar Panels Being built · 1 MW
Feb 2024 5.5 km away Solar farm St Michaels Abbey, Farnborough Road - Solar Panels Approved, not yet built · 210 kW
Apr 2026 6.3 km away Battery storage Penn Croft Farm, Crondall - Battery Energy Storage Facility Approved, not yet built · 100 MW
Jan 2023 6.5 km away Rooftop solar Chancerygate Way - Solar Panels Approved, not yet built · 300 kW
May 2024 6.5 km away Road and street works within 1 km 11 permitted works running now or planned, 10 of them major.
Major Church Road, Fleet Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2027 350 m away Major Windsor Court, Fleet Highway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 350 m away Major Avenue Road, Fleet Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Sept 2026 to Oct 2026 500 m away Major Albert Street, Fleet Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Sept 2026 to Feb 2027 550 m away Major Church Road, Fleet Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Aug 2026 to Nov 2026 600 m away Major Elvetham Road, Fleet Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Nov 2026 to Jan 2027 650 m away Major Upper Street, Fleet Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Apr 2027 650 m away Major Clarence Road, Fleet Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Jan 2027 to Apr 2027 650 m away Major, planned Fleet Road, Fleet Works for road purposes · HAMPSHIRE COUNTY COUNCIL · No carriageway incursion
Sept 2026 to Oct 2026 850 m away Major infrastructure projects within 30 km Decided decided Oct 2020 14.5 km away Decided decided Sept 2016 23.3 km away Decided decided May 2022 27.3 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: Hungerford Farm (solar farm, 3.0 km); Taplins Farm solar park (solar farm, 3.2 km); Farnborough Airport - Solar Panels (rooftop solar, 4.2 km); Marsh House Solar Park (solar farm, 8.8 km); Runfold Landfill (landfill gas, 9.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.