23new homes completed within 2 km, last 2 years
22homes given permission on brownfield sites since 2021
+5.3%like-for-like prices in Yateley West & Eversley, 2024 → 2025 (council +2.8%)
-4%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
12homes extended 2021–2025, typically adding 30 m²
21since energy certificates began (2008)
1in GU46 6NL itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
24 planned, approved or being built and 3 running (13 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Edgbarrow School, Grant Road - Solar PanelsApproved, not yet built · 200 kW
Jun 2026
4.1 km away - Rooftop solar
Tesco Stores, Marshall Road - Solar PanelsApproved, not yet built · 210 kW
Dec 2025
4.4 km away - Rooftop solar
The Paddock Centre, Joshua Jebb Way - Solar PanelsApproved, not yet built · 190 kW
Jan 2025
5.0 km away - Rooftop solar
Gbc Uk, Glebeland Road - Solar PanelsPlanning application in · 240 kW
Mar 2026
5.0 km away - Rooftop solar
Contra House, Oak Close - Solar PanelsPlanning application in · 350 kW
Jun 2026
5.2 km away - Rooftop solar
Data Centre, Dennison House, Stanhope Road - Solar PanelsApproved, not yet built · 1 MW
Jan 2025
5.2 km away - Rooftop solar
Broadmoor Hospital, Lower Broadmoor Road - Solar Photovoltaic PanelsApproved, not yet built · 430 kW
Feb 2026
5.7 km away - Solar farm
Barkham Farms - Solar FarmApproved, not yet built · 33 MW
Jan 2022
5.9 km away - Battery storage
West Side Of France Hill Drive - Battery Energy StorageApproved, not yet built · 200 kW
Jul 2025
6.0 km away - Rooftop solar
Chancerygate Way - Solar PanelsApproved, not yet built · 300 kW
May 2024
6.6 km away
Road and street works within 1 km
5 permitted works running now or planned, 3 of them major.
- Major, planned
Handford Lane, YateleyHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Dec 2026
650 m away - Major
Handford Lane, YateleyHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Dec 2026
650 m away - Major, planned
Churchill Crescent, YateleySection 50 · HAMPSHIRE COUNTY COUNCIL · Some carriageway incursion
Sept 2026 to Dec 2026
900 m away - Minor
Robins Grove Crescent, YateleyWorks for road purposes · HAMPSHIRE COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
500 m away - Minor
Monteagle Lane, YateleyWorks for road purposes · HAMPSHIRE COUNTY COUNCIL · Some carriageway incursion
Jan 2027 to Jan 2027
500 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Sept 2016
17.6 km away - Decideddecided Oct 2020
20.0 km away - Decideddecided Nov 2023
25.3 km away - Decideddecided May 2022
27.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Running nearest: Taplins Farm solar park (solar farm, 6.3 km); Hungerford Farm (solar farm, 7.1 km); Farnborough Airport - Solar Panels (rooftop solar, 7.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.