Country England and Wales › Region South East › Council Hart › Neighbourhood Yateley West & Eversley › Postcode GU46 6HR What's changing near GU46 6HR Within 2 km, around Yateley West & Eversley in Hart. Building, planning, schools, transport, prices and crime.
23 new homes completed within 2 km, last 2 years
22 homes given permission on brownfield sites since 2021
+5.3% like-for-like prices in Yateley West & Eversley, 2024 → 2025 (council +2.8%)
-4% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
19 homes extended 2021–2025, typically adding 30 m²
34 since energy certificates began (2008)
1 in GU46 6HR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 26 planned, approved or being built and 3 running (13 MW between them). Those within 5 km are on the map above.
Rooftop solar Tesco Stores, Marshall Road - Solar Panels Approved, not yet built · 210 kW
Dec 2025 4.0 km away Rooftop solar Edgbarrow School, Grant Road - Solar Panels Approved, not yet built · 200 kW
Jun 2026 4.0 km away Rooftop solar Gbc Uk, Glebeland Road - Solar Panels Planning application in · 240 kW
Mar 2026 4.6 km away Rooftop solar Contra House, Oak Close - Solar Panels Planning application in · 350 kW
Jun 2026 4.7 km away Rooftop solar Data Centre, Dennison House, Stanhope Road - Solar Panels Approved, not yet built · 1 MW
Jan 2025 4.7 km away Rooftop solar The Paddock Centre, Joshua Jebb Way - Solar Panels Approved, not yet built · 190 kW
Jan 2025 5.0 km away Battery storage West Side Of France Hill Drive - Battery Energy Storage Approved, not yet built · 200 kW
Jul 2025 5.6 km away Rooftop solar Broadmoor Hospital, Lower Broadmoor Road - Solar Photovoltaic Panels Approved, not yet built · 430 kW
Feb 2026 5.6 km away Rooftop solar Chancerygate Way - Solar Panels Approved, not yet built · 300 kW
May 2024 6.0 km away Solar farm Barkham Farms - Solar Farm Approved, not yet built · 33 MW
Jan 2022 6.4 km away Road and street works within 1 km 5 permitted works running now or planned, 4 of them major.
Major, planned Handford Lane, Yateley Highway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Dec 2026 100 m away Major Handford Lane, Yateley Highway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Dec 2026 100 m away Major, planned Churchill Crescent, Yateley Section 50 · HAMPSHIRE COUNTY COUNCIL · Some carriageway incursion
Sept 2026 to Dec 2026 450 m away Major, planned Handford Lane, Yateley Utility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Multi-way signals
Jan 2027 to Feb 2027 600 m away Minor Monteagle Lane, Yateley Works for road purposes · HAMPSHIRE COUNTY COUNCIL · Some carriageway incursion
Jan 2027 to Jan 2027 650 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Sept 2016 17.8 km away Decided decided Oct 2020 19.8 km away Decided decided Nov 2023 25.4 km away Decided decided May 2022 26.6 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: Taplins Farm solar park (solar farm, 6.2 km); Farnborough Airport - Solar Panels (rooftop solar, 6.9 km); Hungerford Farm (solar farm, 7.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.