What's changing near GU35 9QY
Within 2 km, around Bordon & Lindford in East Hampshire. Building, planning, schools, transport, prices and crime.
455new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.1%like-for-like prices in Bordon & Lindford, 2024 → 2025 (council +0.8%)
+5%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
23 new homes completed18 flats, 5 houses · Dec 2024 – Oct 2026
planned Oct 2026
1.2 km away - New homes
23 new homes completedhouses · Nov 2025 – Oct 2026
planned Oct 2026
1.4 km away - New homes
31 new homes completed3 flats, 28 houses · Nov 2025 – Oct 2026
planned Oct 2026
1.5 km away - New homes
46 new homes completed1 flats, 45 houses · Dec 2024 – Oct 2026
Oct 2026
1.3 km away - New homes
11 new homes completed1 flats, 10 houses · Mar 2026 – Jul 2026
Jul 2026
950 m away - New homes
12 new homes completed2 flats, 10 houses · Jul 2025 – Jun 2026
Jun 2026
1.5 km away - New homes
13 new homes completedhouses · Sep 2025 – Jun 2026
Jun 2026
1.0 km away - New homes
25 new homes completed1 flats, 24 houses · Nov 2025 – Jun 2026
Jun 2026
1.2 km away - New homes
20 new homes completedhouses · Apr 2025 – May 2026
May 2026
1.3 km away - New homes
79 new homes completed10 flats, 69 houses · Nov 2024 – May 2026
May 2026
1000 m away - New homes
17 new homes completed14 flats, 3 houses · Dec 2024 – Apr 2026
Apr 2026
1.1 km away - New homes
31 new homes completed
8homes extended 2021–2025, typically adding 26 m²
23since energy certificates began (2008)
1in GU35 9QY itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
98hours of spills in 2025 between them (typical neighbourhood: about 36)
9spill events counted
- Thames Water
Bordon Wastewater Treatment Worksinto Wey (Southern Branch)9 spills, 98 hours in 2025
1.7 km away - Thames Water
Passfield Spsinto River Wey0 spills, 0 hours in 2025
2.0 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
10 planned, approved or being built and 3 running (27 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Old Thorns Golf and Country Club - Solar PanelsApproved, not yet built · 220 kW
Mar 2023
3.8 km away - Rooftop solar
Sandhill Farm, Picketts Hill - Solar panelsApproved, not yet built · 440 kW
Oct 2024
4.0 km away - Solar farm
Steyne Farm - Solar PanelsPlanning application in
Jan 2021
7.5 km away - Solar farm
Copse Close Solar FarmApproved, not yet built · 50 MW
Feb 2023
7.8 km away - Battery storage
Copse Close Solar FarmApproved, not yet built
Feb 2023
7.8 km away - Battery storage
Tilford Road, Nr Tower Road - Micro Energy Storage FacilityPlanning application in · 200 kW
Aug 2024
8.0 km away - Solar farm
Gaston Lane, Farringdon - Solar Farm & Battery StoragePlanning application in · 44 MW
Jun 2025
8.7 km away - Battery storage
Gaston Lane, Farringdon - Solar Farm & Battery StoragePlanning application in · 2 MW
Jun 2025
8.7 km away - Anaerobic digestion
Alton Materials Recovery Facility - Anaerobic Digestion FacilityPlanning application in · 2 MW
Feb 2023
8.9 km away - Rooftop solar
Maltbys Engineering, Newman Lane - Solar PanelsApproved, not yet built
Mar 2025
9.1 km away
Running nearest: Wilsom Farm (solar farm, 7.7 km); Land to the north and south of Cakers Lane (Wilsom) (solar farm, 7.7 km); Barley Wood Farm Lane (solar farm, 8.5 km).
Road and street works within 1 km
3 permitted works running now or planned, 2 of them major.
- Major
Woodside Crescent, BordonHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026
700 m away - Major, planned
Liphook Road, BordonHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
750 m away - Minor
Woodside Crescent, BordonNew service connection · BT · Give and take
Oct 2026 to Oct 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2020
8.9 km away - Decision
AQUIND InterconnectorElectric Lines · From the UK seaward limit in the English Channel to Lovedean Substation. application due Q4 2019
24.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.