Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
Thames Water
Arford Pumping Stationinto River Wey0 spills, 0 hours in 2025
1.1 km away
Thames Water
Passfield Spsinto River Wey0 spills, 0 hours in 2025
Copse Close Solar FarmApproved, not yet built · 50 MW
Feb 2023 10.0 km away
Battery storage
Copse Close Solar FarmApproved, not yet built
Feb 2023 10.0 km away
Running nearest: Farnham Landfill (landfill gas, 8.9 km); Wilsom Farm (solar farm, 9.5 km); Land to the north and south of Cakers Lane (Wilsom) (solar farm, 9.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
Major, planned
Liphook Road, BordonHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 700 m away
Major
Liphook Road, BordonHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
AQUIND InterconnectorElectric Lines · From the UK seaward limit in the English Channel to Lovedean Substation.
application due Q4 2019 26.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Headley Down & Grayshott: +25% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.1% in two years.