Country England and Wales › Region South East › Council Waverley › Neighbourhood Haslemere East › Postcode GU27 2PP What's changing near GU27 2PP Within 2 km, around Haslemere East in Waverley. Building, planning, schools, transport, prices and crime.
143 new homes completed within 2 km, last 2 years
55 homes given permission on brownfield sites since 2021
+5.2% like-for-like prices in Haslemere East, 2024 → 2025 (council +2.3%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School closed Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 21 new homes completed houses · Nov 2024 – Jul 2026
Jul 2026 700 m away New homes 9 new homes completed 4 flats, 5 houses · Sep 2025 – Jul 2026
Jul 2026 650 m away New homes 12 new homes completed 4 flats, 8 houses · Oct 2025 – Apr 2026
Apr 2026 650 m away New homes 6 new homes completed 4 flats, 2 houses · Sep 2025 – Mar 2026
Mar 2026 700 m away New homes 6 new homes completed houses · Nov 2025 – Feb 2026
Feb 2026 1.9 km away New homes 7 new homes completed houses · Feb 2025 – Nov 2025
Nov 2025 650 m away School closed School closed: The Royal School Other independent school, other independent school (closure)
Aug 2025 2.0 km away Planning permission Jul 2025 1.7 km away New homes 38 new homes completed 5 flats, 33 houses · Oct 2024 – Mar 2025
Mar 2025 700 m away New homes 9 new homes completed flats · Jan 2025
Jan 2025 750 m away New homes 23 homes extended 2021–2025, typically adding 47 m²
38 since energy certificates began (2008)
3 in GU27 2PP itself
Extended certificate 2025 Extended certificate 2022 Extended certificate 2021 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 2 planned, approved or being built and 0 running. Those within 5 km are on the map above.
Battery storage Tilford Road, Nr Tower Road - Micro Energy Storage Facility Planning application in · 200 kW
Aug 2024 4.8 km away Rooftop solar Old Thorns Golf and Country Club - Solar Panels Approved, not yet built · 220 kW
Mar 2023 8.1 km away DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km 8 permitted works running now or planned, 4 of them major.
Major Longdene Road, Haslemere Utility repair and maintenance works · THAMES WATER · Road closure
Oct 2026 to Oct 2026 350 m away Major, planned Shepherds Hill Service Road, Haslemere Utility asset works · BT · Road closure
Dec 2026 to Dec 2026 350 m away Major Derby Road, Haslemere Highway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 500 m away Major, planned Scotland Lane, Haslemere Utility repair and maintenance works · THAMES WATER · Road closure
Dec 2026 to Dec 2026 950 m away Standard High Street, Haslemere Utility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Some carriageway incursion
Nov 2026 to Nov 2026 650 m away Minor Shepherds Hill, Haslemere Utility asset works · BT · Two-way signals
Dec 2026 to Dec 2026 300 m away Minor High Street, Haslemere Utility repair and maintenance works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026 600 m away Minor Tanners Lane, Haslemere Utility repair and maintenance works · THAMES WATER · Give and take
Oct 2026 to Oct 2026 700 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2020 17.5 km away Decision AQUIND Interconnector Electric Lines · From the UK seaward limit in the English Channel to Lovedean Substation. application due Q4 2019 29.4 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.