Country England and Wales › Region South East › Council Waverley › Neighbourhood Haslemere East › Postcode GU27 2JP What's changing near GU27 2JP Within 2 km, around Haslemere East in Waverley. Building, planning, schools, transport, prices and crime.
136 new homes completed within 2 km, last 2 years
45 homes given permission on brownfield sites since 2021
+5.2% like-for-like prices in Haslemere East, 2024 → 2025 (council +2.3%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended homeBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 21 new homes completed houses · Nov 2024 – Jul 2026
Jul 2026 500 m away New homes 9 new homes completed 4 flats, 5 houses · Sep 2025 – Jul 2026
Jul 2026 550 m away New homes 12 new homes completed 4 flats, 8 houses · Oct 2025 – Apr 2026
Apr 2026 600 m away New homes 6 new homes completed 4 flats, 2 houses · Sep 2025 – Mar 2026
Mar 2026 100 m away New homes 7 new homes completed houses · Feb 2025 – Nov 2025
Nov 2025 400 m away New homes 38 new homes completed 5 flats, 33 houses · Oct 2024 – Mar 2025
Mar 2025 1.4 km away New homes 9 new homes completed flats · Jan 2025
Jan 2025 1.4 km away New homes 20 new homes completed flats · Nov 2024 – Jan 2025
Jan 2025 1.8 km away Planning permission Mar 2023 1.4 km away Planning permission 14 homes extended 2021–2025, typically adding 38 m²
27 since energy certificates began (2008)
3 in GU27 2JP itself
Extended certificate 2023 Extended certificate 2021 Extended certificate 2018 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 2 planned, approved or being built and 0 running. Those within 5 km are on the map above.
Battery storage Tilford Road, Nr Tower Road - Micro Energy Storage Facility Planning application in · 200 kW
Aug 2024 5.4 km away Rooftop solar Old Thorns Golf and Country Club - Solar Panels Approved, not yet built · 220 kW
Mar 2023 8.8 km away DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km 12 permitted works running now or planned, 7 of them major.
Major Haste Hill, Haslemere Highway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 300 m away Major, planned Scotland Lane, Haslemere Utility repair and maintenance works · THAMES WATER · Road closure
Dec 2026 to Dec 2026 350 m away Major Scotland Lane, Haslemere Highway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 450 m away Major Blackdown Lane, Haslemere Highway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 450 m away Major, planned Shepherds Hill Service Road, Haslemere Utility asset works · BT · Road closure
Dec 2026 to Dec 2026 500 m away Major Tennysons Lane, Haslemere Highway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 550 m away Major Derby Road, Haslemere Highway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 1000 m away Standard High Street, Haslemere Utility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Some carriageway incursion
Nov 2026 to Nov 2026 450 m away Minor Petworth Road, Haslemere Highway repair and maintenance works · SURREY COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026 250 m away Major infrastructure projects within 30 km Decided decided Oct 2020 18.3 km away Decision AQUIND Interconnector Electric Lines · From the UK seaward limit in the English Channel to Lovedean Substation. application due Q4 2019 29.8 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.