12 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+3.1% like-for-like prices in Mayford & Brookwood, 2024 → 2025 (council +2.2%)
-22% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 2 postcodes nearby had new homes completed in the last two years.
8 homes extended 2021–2025, typically adding 48 m²
13 since energy certificates began (2008)
1 in GU24 0HE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 27 planned, approved or being built and 2 running (5 MW between them). Those within 5 km are on the map above.
Battery storage Lucas Green Road - Micro Energy Storage System Planning application in · 200 kW
Aug 2024 3.2 km away Battery storage Electricty Sub Station, Wilders Close - Micro Energy Storage Approved, not yet built · 200 kW
Apr 2026 3.7 km away Rooftop solar Kestrel Way - Solar Panels Approved, not yet built · 1 MW
Mar 2024 3.7 km away Battery storage Aldershot Road, Fairlands - Micro Energy Storage Unit Approved, not yet built · 200 kW
Mar 2026 4.5 km away Rooftop solar Guildford Road - Solar Array Approved, not yet built · 270 kW
Aug 2021 4.8 km away Rooftop solar David Lloyd Leisure, Westfield Avenue - Solar Panels Approved, not yet built
Jun 2023 4.9 km away Battery storage Hollywood Quarter, Church Street East - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jan 2026 5.3 km away Battery storage Woking Road & Whitemore Road - Battery Storage System Planning application in · 200 kW
Jun 2026 6.3 km away Rooftop solar Slyfield Industrial Estate, Slyfield - Solar PV System Approved, not yet built · 150 kW
Jul 2024 6.4 km away Rooftop solar Royal Surrey County Hospital - Solar Panels Being built
Feb 2026 7.3 km away Road and street works within 1 km 1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2022 12.5 km away Decided decided Sept 2016 22.0 km away Pre-application application due December 2027 22.2 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 22.8 km away Decided decided Nov 2023 24.3 km away Decided decided Oct 2020 26.1 km away Pre-application Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Trumps Farm (AD) (anaerobic digestion, 9.4 km); Trumps Farm Landfill Scheme (landfill gas, 9.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.