What's changing near GU23 7BT
Within 2 km, around West Clandon & Send in Guildford. Building, planning, schools, transport, prices and crime.
84new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.8%like-for-like prices in West Clandon & Send, 2024 → 2025 (council +2.6%)
+44%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
9 new homes completed3 flats, 6 houses · Sep 2026 – Oct 2026
planned Oct 2026
800 m away - New homes
20 new homes completed1 flats, 19 houses · Sep 2025 – Oct 2026
planned Oct 2026
800 m away - New homes
20 new homes completedhouses · Sep 2025 – Oct 2026
planned Oct 2026
850 m away - New homes
5 new homes completed3 flats, 2 houses · Sep 2025 – Jun 2026
Jun 2026
850 m away - New homes
12 new homes completed4 flats, 8 houses · Dec 2024 – Jun 2025
Jun 2025
1.7 km away - New homes
5 new homes completedhouses · Nov 2024 – Jan 2025
Jan 2025
500 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
2homes extended 2021–2025, typically adding 41 m²
15since energy certificates began (2008)
1in GU23 7BT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
23 planned, approved or being built and 2 running (2 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Sainsburys Superstore, Clay Lane - Solar PV PanelsPlanning application in · 560 kW
Jun 2026
3.2 km away - Rooftop solar
David Lloyd Leisure, Westfield Avenue - Solar PanelsApproved, not yet built
Jun 2023
3.6 km away - Rooftop solar
Slyfield Industrial Estate, Slyfield - Solar PV SystemApproved, not yet built · 150 kW
Jul 2024
4.3 km away - Rooftop solar
Guildford Road - Solar ArrayApproved, not yet built · 270 kW
Aug 2021
4.4 km away - Battery storage
Woking Road & Whitemore Road - Battery Storage SystemPlanning application in · 200 kW
Jun 2026
4.5 km away - Battery storage
Hollywood Quarter, Church Street East - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jan 2026
4.9 km away - Rooftop solar
Guildford Spectrum Leisure Centre, Parkway - Solar PanelsApproved, not yet built · 550 kW
Jun 2026
4.9 km away - Battery storage
Electricty Sub Station, Wilders Close - Micro Energy StorageApproved, not yet built · 200 kW
Apr 2026
5.2 km away - Rooftop solar
West Byfleet Consulting Rooms, Madeira Road - Solar panelsApproved, not yet built · 160 kW
Mar 2024
6.1 km away - Rooftop solar
Kestrel Way - Solar PanelsApproved, not yet built · 1 MW
Mar 20246.4 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided May 2022
6.4 km away - Pre-applicationapplication due December 2027
21.4 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
22.8 km away - Pre-applicationapplication due March 2027
23.6 km away - Decideddecided Sept 2025
27.6 km away - Decideddecided Nov 2023
27.7 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Albury Landfill (landfill gas, 7.0 km); Cobham Motorway Service Area - Solar Photovoltaics (rooftop solar, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.