Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Kestrel Way - Solar PanelsApproved, not yet built · 1 MW
Mar 2024 6.8 km away
Landfill gas
Albury Landfill Site ExtensionPlanning application in · 330 kW
Jul 2022 6.8 km away
Running nearest: Albury Landfill (landfill gas, 7.0 km); Cobham Motorway Service Area - Solar Photovoltaics (rooftop solar, 7.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · M4 Motorway from Junction 3 in Borough of Hounslow, London to Junction 12 in West Berkshire
decided Sept 2016 28.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.