What's changing near GU23 6JE
Within 2 km, around West Clandon & Send in Guildford. Building, planning, schools, transport, prices and crime.
63new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.8%like-for-like prices in West Clandon & Send, 2024 → 2025 (council +2.6%)
+44%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedhouses · Sep 2026 – Oct 2026
Oct 2026
750 m away - New homes
16 new homes completedhouses · Sep 2025 – Oct 2026
Oct 2026
700 m away - New homes
19 new homes completed1 flats, 18 houses · Sep 2025 – Sep 2026
Sept 2026
600 m away - New homes
5 new homes completed3 flats, 2 houses · Sep 2025 – Jun 2026
Jun 2026
500 m away - New homes
5 new homes completedhouses · Nov 2024 – Jan 2025
Jan 2025
950 m away - New homes
5 new homes completedhouses · Oct 2024
Oct 2024
1.7 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 12 postcodes nearby had new homes completed in the last two years.
8homes extended 2021–2025, typically adding 42 m²
19since energy certificates began (2008)
1in GU23 6JE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
24 planned, approved or being built and 2 running (2 MW between them). Those within 5 km are on the map above.
- Rooftop solar
David Lloyd Leisure, Westfield Avenue - Solar PanelsApproved, not yet built
Jun 2023
3.9 km away - Rooftop solar
Sainsburys Superstore, Clay Lane - Solar PV PanelsPlanning application in · 560 kW
Jun 2026
4.0 km away - Rooftop solar
Guildford Road - Solar ArrayApproved, not yet built · 270 kW
Aug 2021
4.6 km away - Battery storage
Hollywood Quarter, Church Street East - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jan 2026
4.9 km away - Rooftop solar
Slyfield Industrial Estate, Slyfield - Solar PV SystemApproved, not yet built · 150 kW
Jul 2024
5.1 km away - Battery storage
Woking Road & Whitemore Road - Battery Storage SystemPlanning application in · 200 kW
Jun 2026
5.3 km away - Battery storage
Electricty Sub Station, Wilders Close - Micro Energy StorageApproved, not yet built · 200 kW
Apr 2026
5.6 km away - Rooftop solar
West Byfleet Consulting Rooms, Madeira Road - Solar panelsApproved, not yet built · 160 kW
Mar 2024
5.6 km away - Rooftop solar
Guildford Spectrum Leisure Centre, Parkway - Solar PanelsApproved, not yet built · 550 kW
Jun 2026
5.7 km away - Rooftop solar
Fullbrook School, Selsdon Road - Solar panelsApproved, not yet built · 180 kW
Jan 20246.2 km away
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
- Major, planned
Grove Heath Road, RipleyNew service connection · UK POWER NETWORKS SOUTH EASTERN · Road closure
Oct 2026 to Jan 2027
900 m away - Major
Grove Heath Road, RipleyNew service connection · UK POWER NETWORKS SOUTH EASTERN · Road closure
Oct 2026 to Jan 2027
900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided May 2022
5.6 km away - Pre-applicationapplication due December 2027
20.8 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
22.3 km away - Pre-applicationapplication due March 2027
22.8 km away - Decideddecided Sept 2025
27.2 km away - Decideddecided Nov 2023
27.4 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Albury Landfill (landfill gas, 7.2 km); Cobham Motorway Service Area - Solar Photovoltaics (rooftop solar, 7.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.