What's changing near GU22 8DW
Within 2 km, around Maybury Hill & Pyrford South in Woking. Building, planning, schools, transport, prices and crime.
715new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-2.4%like-for-like prices in Maybury Hill & Pyrford South, 2024 → 2025 (council +2.2%)
-7%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
18 new homes completedflats · Apr 2026 – Jun 2026
Jun 2026
1.7 km away - New homes
54 new homes completedflats · Nov 2025 – Feb 2026
Feb 2026
1.1 km away - New homes
17 new homes completedflats · Dec 2025
Dec 2025
1.0 km away - New homes
98 new homes completedflats · Dec 2025
Dec 2025
1.7 km away - New homes
89 new homes completedflats · Dec 2025
Dec 2025
1.7 km away - New homes
60 new homes completedflats · Dec 2025
Dec 2025
1.7 km away - New homes
91 new homes completedflats · Dec 2025
Dec 2025
1.7 km away - New homes
88 new homes completedflats · Dec 2025
Dec 2025
1.7 km away - New homes
53 new homes completedflats · Oct 2024 – Nov 2025
Nov 2025
1.4 km away - New homes
6 new homes completedflats · Mar 2025 – Aug 2025
Aug 2025
1.4 km away - New homes
5 new homes completedhouses · Jul 2025
Jul 2025
550 m away - New homes
37 new homes completedflats · Oct 2024 – Apr 2025
Apr 2025
1.4 km away - New homes
27homes extended 2021–2025, typically adding 32 m²
49since energy certificates began (2008)
1in GU22 8DW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
125hours of spills in 2025 between them (typical neighbourhood: about 36)
10spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
22 planned, approved or being built and 4 running (7 MW between them). Those within 5 km are on the map above.
- Battery storage
Hollywood Quarter, Church Street East - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jan 2026
1.4 km away - Rooftop solar
Guildford Road - Solar ArrayApproved, not yet built · 270 kW
Aug 2021
1.8 km away - Rooftop solar
David Lloyd Leisure, Westfield Avenue - Solar PanelsApproved, not yet built
Jun 2023
2.2 km away - Rooftop solar
Mclaren Technology Centre, Chertsey Road - Solar PanelsApproved, not yet built · 3 MW
Nov 2025
2.8 km away - Rooftop solar
West Byfleet Consulting Rooms, Madeira Road - Solar panelsApproved, not yet built · 160 kW
Mar 2024
2.9 km away - Battery storage
Electricty Sub Station, Wilders Close - Micro Energy StorageApproved, not yet built · 200 kW
Apr 2026
3.0 km away - Rooftop solar
Fullbrook School, Selsdon Road - Solar panelsApproved, not yet built · 180 kW
Jan 2024
3.3 km away - Rooftop solar
Kestrel Way - Solar PanelsApproved, not yet built · 1 MW
Mar 2024
3.4 km away - Rooftop solar
Big Yellow Byfleet, Oyster Lane - Solar PanelsApproved, not yet built · 180 kW
Oct 2025
4.8 km away - Rooftop solar
Avro Way, Brooklands Industrial Park - Solar PanelApproved, not yet built · 180 kW
Mar 2024
5.0 km away
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided May 2022
6.0 km away - Pre-applicationapplication due December 2027
17.8 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
19.0 km away - Pre-applicationapplication due March 2027
21.0 km away - Decideddecided Nov 2023
23.4 km away - Decideddecided Sept 2016
23.9 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Trumps Farm (AD) (anaerobic digestion, 7.3 km); Trumps Farm Landfill Scheme (landfill gas, 7.6 km); Chertsey Water Treatment Works (solar farm, 8.3 km); Cobham Motorway Service Area - Solar Photovoltaics (rooftop solar, 9.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.