Country England and Wales › Region South East › Council Woking › Neighbourhood Woking Central › Postcode GU22 7WH What's changing near GU22 7WH Within 2 km, around Woking Central in Woking. Building, planning, schools, transport, prices and crime.
606 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+0.9% like-for-like prices in Woking Central, 2024 → 2025 (council +2.2%)
+12% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 18 new homes completed flats · Apr 2026 – Jun 2026
Jun 2026 1.9 km away New homes 54 new homes completed flats · Nov 2025 – Feb 2026
Feb 2026 850 m away New homes 6 new homes completed flats · Feb 2026
Feb 2026 1.8 km away New homes 20 new homes completed 3 flats, 17 houses · Nov 2024 – Feb 2026
Feb 2026 1.7 km away New homes 11 new homes completed flats · Jan 2026
Jan 2026 1.8 km away New homes 17 new homes completed flats · Dec 2025
Dec 2025 950 m away New homes 6 new homes completed flats · Dec 2025
Dec 2025 1.8 km away New homes 98 new homes completed flats · Dec 2025
Dec 2025 200 m away New homes 89 new homes completed flats · Dec 2025
Dec 2025 200 m away New homes 60 new homes completed flats · Dec 2025
Dec 2025 200 m away New homes 91 new homes completed flats · Dec 2025
Dec 2025 200 m away New homes 88 new homes completed flats · Dec 2025
Dec 2025 200 m away New homes 34 homes extended 2021–2025, typically adding 23 m²
62 since energy certificates began (2008)
0 in GU22 7WH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 27 planned, approved or being built and 3 running (7 MW between them). Those within 5 km are on the map above.
Rooftop solar Guildford Road - Solar Array Approved, not yet built · 270 kW
Aug 2021 250 m away Battery storage Hollywood Quarter, Church Street East - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jan 2026 600 m away Battery storage Electricty Sub Station, Wilders Close - Micro Energy Storage Approved, not yet built · 200 kW
Apr 2026 1.2 km away Rooftop solar David Lloyd Leisure, Westfield Avenue - Solar Panels Approved, not yet built
Jun 2023 1.2 km away Rooftop solar Kestrel Way - Solar Panels Approved, not yet built · 1 MW
Mar 2024 1.9 km away Rooftop solar Mclaren Technology Centre, Chertsey Road - Solar Panels Approved, not yet built · 3 MW
Nov 2025 3.4 km away Rooftop solar West Byfleet Consulting Rooms, Madeira Road - Solar panels Approved, not yet built · 160 kW
Mar 2024 4.5 km away Rooftop solar Fullbrook School, Selsdon Road - Solar panels Approved, not yet built · 180 kW
Jan 2024 4.9 km away Rooftop solar Slyfield Industrial Estate, Slyfield - Solar PV System Approved, not yet built · 150 kW
Jul 2024 6.2 km away Battery storage Woking Road & Whitemore Road - Battery Storage System Planning application in · 200 kW
Jun 2026 6.3 km away Road and street works within 1 km 12 permitted works running now or planned, 2 of them major.
Major, planned West Hill Road, Woking Utility repair and maintenance works · AFFINITY WATER - C · Road closure
Nov 2026 to Nov 2026 900 m away Major, planned Park Road, Woking Utility repair and maintenance works · AFFINITY WATER - C · Road closure
Nov 2026 to Dec 2026 900 m away Standard Chapel Street, Woking New service connection · UK POWER NETWORKS SOUTH EASTERN · Some carriageway incursion
Jan 2027 to Jan 2027 300 m away Standard High Street, Woking New service connection · UK POWER NETWORKS SOUTH EASTERN · Some carriageway incursion
Jan 2027 to Jan 2027 350 m away Standard Chertsey Road, Woking Disconnection or alteration of supply · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Oct 2026 to Oct 2026 450 m away Standard Oriental Road, Woking Utility repair and maintenance works · AFFINITY WATER - C · Two-way signals
Oct 2026 to Nov 2026 550 m away Standard Chertsey Road, Woking Disconnection or alteration of supply · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Oct 2026 to Nov 2026 600 m away Standard Heathside Park Road, Woking Utility repair and maintenance works · THAMES WATER · Give and take
Oct 2026 to Nov 2026 650 m away Minor Heathside Road, Woking Highway repair and maintenance works · SURREY COUNTY COUNCIL · Multi-way signals
Nov 2026 to Nov 2026 300 m away Major infrastructure projects within 30 km Decided decided May 2022 7.7 km away Pre-application application due December 2027 18.8 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 19.9 km away Pre-application application due March 2027 22.5 km away Decided decided Sept 2016 23.2 km away Decided decided Nov 2023 23.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Trumps Farm (AD) (anaerobic digestion, 7.3 km); Trumps Farm Landfill Scheme (landfill gas, 7.7 km); Chertsey Water Treatment Works (solar farm, 8.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.