What's changing near GU21 5TZ
Within 2 km, around Sheerwater in Woking. Building, planning, schools, transport, prices and crime.
328new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.4%like-for-like prices in Sheerwater, 2024 → 2025 (council +2.2%)
-0%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedflats · Aug 2026
Aug 2026
1.8 km away - New homes
18 new homes completedflats · Apr 2026 – Jun 2026
Jun 2026
2.0 km away - New homes
7 new homes completedflats · Feb 2026
Feb 2026
1.4 km away - New homes
38 new homes completedflats · Jan 2025 – Nov 2025
Nov 2025
550 m away - New homes
59 new homes completedflats · Nov 2025
Nov 2025
1.4 km away - New homes
47 new homes completedflats · Nov 2025
Nov 2025
1.4 km away - New homes
38 new homes completedflats · Nov 2025
Nov 2025
1.4 km away - New homes
26 new homes completedflats · Nov 2025
Nov 2025
1.5 km away - New homes
5 new homes completedhouses · Jul 2025
Jul 2025
1.5 km away - New homes
8 new homes completedflats · Jul 2025
Jul 2025
700 m away - New homes
27 new homes completedflats · Jun 2025
Jun 2025
1.4 km away - New homes
32 new homes completedflats · Dec 2024
Dec 2024
600 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 21 postcodes nearby had new homes completed in the last two years.
22homes extended 2021–2025, typically adding 35 m²
30since energy certificates began (2008)
0in GU21 5TZ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
22 planned, approved or being built and 7 running (15 MW between them). Those within 5 km are on the map above.
- Rooftop solar
West Byfleet Consulting Rooms, Madeira Road - Solar panelsApproved, not yet built · 160 kW
Mar 2024
1.3 km away - Rooftop solar
Fullbrook School, Selsdon Road - Solar panelsApproved, not yet built · 180 kW
Jan 2024
1.6 km away - Rooftop solar
Mclaren Technology Centre, Chertsey Road - Solar PanelsApproved, not yet built · 3 MW
Nov 2025
1.9 km away - Battery storage
Hollywood Quarter, Church Street East - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jan 2026
2.7 km away - Rooftop solar
Big Yellow Byfleet, Oyster Lane - Solar PanelsApproved, not yet built · 180 kW
Oct 2025
3.3 km away - Rooftop solar
Guildford Road - Solar ArrayApproved, not yet built · 270 kW
Aug 2021
3.4 km away - Rooftop solar
Avro Way, Brooklands Industrial Park - Solar PanelApproved, not yet built · 180 kW
Mar 2024
3.5 km away - Rooftop solar
Vickers Drive North, Brooklands Industrial Park - Solar PanelsApproved, not yet built · 230 kW
Apr 2023
3.9 km away - Battery storage
Weymanor Road - Battery StorageApproved, not yet built
Oct 2024
3.9 km away - Rooftop solar
David Lloyd Leisure, Westfield Avenue - Solar PanelsApproved, not yet built
Jun 20233.9 km away
Road and street works within 1 km
8 permitted works running now or planned, 4 of them major.
- Major, planned
Sheerwater Road, West ByfleetUtility asset works · mua Electricity Limited · Multi-way signals
Oct 2026 to Nov 2026
650 m away - Major, planned
Sheerwater Road, WokingUtility asset works · mua Electricity Limited · Multi-way signals
Oct 2026 to Nov 2026
700 m away - Major, planned
Sheerwater Road, West ByfleetUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Aug 2027 to Aug 2027
750 m away - Major
Woodlands Avenue, West ByfleetUtility asset works · mua Electricity Limited · Multi-way signals
Jan 2027 to Mar 2027
950 m away - Standard
Dartmouth Avenue, WokingHighway improvement works · SURREY COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
450 m away - Standard
Woodham Lane, WokingUtility asset works · mua Electricity Limited · Multi-way signals
Nov 2026 to Nov 2026
750 m away - Minor
Broadwater Close, WokingDisconnection or alteration of supply · CADENT GAS LIMITED · No carriageway incursion
Oct 2026 to Oct 2026
500 m away - Minor
Dorin Court, WokingUtility repair and maintenance works · AFFINITY WATER - C · Some carriageway incursion
Oct 2026 to Oct 2026
750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided May 2022
5.3 km away - Pre-applicationapplication due December 2027
16.1 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
17.3 km away - Pre-applicationapplication due March 2027
19.3 km away - Decideddecided Nov 2023
22.2 km away - Decideddecided Sept 2016
23.3 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Trumps Farm (AD) (anaerobic digestion, 6.3 km); Trumps Farm Landfill Scheme (landfill gas, 6.6 km); Chertsey Water Treatment Works (solar farm, 6.9 km); Norlands Lane Landfill Site (Extension) (landfill gas, 8.6 km); Cobham Motorway Service Area - Solar Photovoltaics (rooftop solar, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.