Country England and Wales › Region South East › Council Woking › Neighbourhood Horsell › Postcode GU21 5TR What's changing near GU21 5TR Within 2 km, around Horsell in Woking. Building, planning, schools, transport, prices and crime.
421 new homes completed within 2 km, last 2 years
14 homes given permission on brownfield sites since 2021
+4.9% like-for-like prices in Horsell, 2024 → 2025 (council +2.2%)
+1% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 6 new homes completed flats · Aug 2026
Aug 2026 1.3 km away New homes 5 new homes completed 2 flats, 3 houses · Oct 2024 – Jun 2026
Jun 2026 1.6 km away New homes 7 new homes completed flats · Feb 2026
Feb 2026 1.2 km away New homes 53 new homes completed flats · Oct 2024 – Nov 2025
Nov 2025 950 m away New homes 59 new homes completed flats · Nov 2025
Nov 2025 1.2 km away New homes 47 new homes completed flats · Nov 2025
Nov 2025 1.1 km away New homes 38 new homes completed flats · Nov 2025
Nov 2025 1.2 km away New homes 26 new homes completed flats · Nov 2025
Nov 2025 1.2 km away New homes 5 new homes completed houses · Jul 2025
Jul 2025 2.0 km away New homes 8 new homes completed flats · Jul 2025
Jul 2025 400 m away New homes 27 new homes completed flats · Jun 2025
Jun 2025 1.2 km away New homes 37 new homes completed flats · Oct 2024 – Apr 2025
Apr 2025 1000 m away New homes 16 homes extended 2021–2025, typically adding 65 m²
24 since energy certificates began (2008)
0 in GU21 5TR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 25 planned, approved or being built and 7 running (15 MW between them). Those within 5 km are on the map above.
Rooftop solar West Byfleet Consulting Rooms, Madeira Road - Solar panels Approved, not yet built · 160 kW
Mar 2024 1.1 km away Rooftop solar Fullbrook School, Selsdon Road - Solar panels Approved, not yet built · 180 kW
Jan 2024 1.2 km away Rooftop solar Mclaren Technology Centre, Chertsey Road - Solar Panels Approved, not yet built · 3 MW
Nov 2025 1.7 km away Rooftop solar Big Yellow Byfleet, Oyster Lane - Solar Panels Approved, not yet built · 180 kW
Oct 2025 3.0 km away Battery storage Hollywood Quarter, Church Street East - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jan 2026 3.1 km away Rooftop solar Avro Way, Brooklands Industrial Park - Solar Panel Approved, not yet built · 180 kW
Mar 2024 3.2 km away Battery storage Weymanor Road - Battery Storage Approved, not yet built
Oct 2024 3.4 km away Rooftop solar Vickers Drive North, Brooklands Industrial Park - Solar Panels Approved, not yet built · 230 kW
Apr 2023 3.5 km away Rooftop solar Guildford Road - Solar Array Approved, not yet built · 270 kW
Aug 2021 3.8 km away Rooftop solar David Lloyd Leisure, Brooklands Road - Solar Photovoltaics Panels Approved, not yet built
Sept 2025 4.3 km away Road and street works within 1 km 12 permitted works running now or planned, 9 of them major.
Major, planned Sheerwater Road, Woking Utility asset works · mua Electricity Limited · Multi-way signals
Oct 2026 to Nov 2026 200 m away Major, planned Sheerwater Road, West Byfleet Utility asset works · mua Electricity Limited · Multi-way signals
Oct 2026 to Nov 2026 350 m away Major, planned Sheerwater Road, West Byfleet Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Aug 2027 to Aug 2027 550 m away Major Woodlands Avenue, West Byfleet Utility asset works · mua Electricity Limited · Multi-way signals
Jan 2027 to Mar 2027 700 m away Major Hollies Avenue, West Byfleet Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Sept 2026 to Nov 2026 750 m away Major Woodlands Avenue, West Byfleet Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Sept 2026 to Nov 2026 800 m away Major Madeira Road, West Byfleet Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Dec 2026 900 m away Major, planned Faris Lane, Addlestone Utility asset works · BT · Road closure
Dec 2026 to Dec 2026 950 m away Major Faris Lane, Addlestone Utility asset works · BT · Road closure
Dec 2026 to Dec 2026 950 m away Major infrastructure projects within 30 km Decided decided May 2022 5.3 km away Pre-application application due December 2027 15.5 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 16.8 km away Pre-application application due March 2027 18.8 km away Decided decided Nov 2023 21.8 km away Decided decided Sept 2016 23.0 km away Pre-application
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Trumps Farm (AD) (anaerobic digestion, 6.0 km); Trumps Farm Landfill Scheme (landfill gas, 6.3 km); Chertsey Water Treatment Works (solar farm, 6.5 km); Norlands Lane Landfill Site (Extension) (landfill gas, 8.1 km); Norlands Lane Landfill Site (landfill gas, 8.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.