Country England and Wales › Region South East › Council Woking › Neighbourhood Horsell › Postcode GU21 4UY What's changing near GU21 4UY Within 2 km, around Horsell in Woking. Building, planning, schools, transport, prices and crime.
512 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+4.9% like-for-like prices in Horsell, 2024 → 2025 (council +2.2%)
+1% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 18 new homes completed flats · Apr 2026 – Jun 2026
Jun 2026 1.9 km away New homes 54 new homes completed flats · Nov 2025 – Feb 2026
Feb 2026 2.0 km away New homes 98 new homes completed flats · Dec 2025
Dec 2025 1.7 km away New homes 89 new homes completed flats · Dec 2025
Dec 2025 1.7 km away New homes 60 new homes completed flats · Dec 2025
Dec 2025 1.7 km away New homes 91 new homes completed flats · Dec 2025
Dec 2025 1.7 km away New homes 88 new homes completed flats · Dec 2025
Dec 2025 1.7 km away New homes 6 new homes completed flats · Mar 2025 – Aug 2025
Aug 2025 1.7 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 14 postcodes nearby had new homes completed in the last two years.
25 homes extended 2021–2025, typically adding 43 m²
48 since energy certificates began (2008)
2 in GU21 4UY itself
Extended certificate 2021 Extended certificate 2016 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
288 hours of spills in 2025 between them (typical neighbourhood: about 36)
20 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 25 planned, approved or being built and 3 running (7 MW between them). Those within 5 km are on the map above.
Rooftop solar Kestrel Way - Solar Panels Approved, not yet built · 1 MW
Mar 2024 650 m away Battery storage Electricty Sub Station, Wilders Close - Micro Energy Storage Approved, not yet built · 200 kW
Apr 2026 1.6 km away Battery storage Hollywood Quarter, Church Street East - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jan 2026 1.7 km away Rooftop solar Guildford Road - Solar Array Approved, not yet built · 270 kW
Aug 2021 2.0 km away Rooftop solar David Lloyd Leisure, Westfield Avenue - Solar Panels Approved, not yet built
Jun 2023 2.9 km away Rooftop solar Mclaren Technology Centre, Chertsey Road - Solar Panels Approved, not yet built · 3 MW
Nov 2025 3.0 km away Battery storage Lucas Green Road - Micro Energy Storage System Planning application in · 200 kW
Aug 2024 5.0 km away Rooftop solar West Byfleet Consulting Rooms, Madeira Road - Solar panels Approved, not yet built · 160 kW
Mar 2024 5.1 km away Rooftop solar Fullbrook School, Selsdon Road - Solar panels Approved, not yet built · 180 kW
Jan 2024 5.3 km away Rooftop solar Big Yellow Byfleet, Oyster Lane - Solar Panels Approved, not yet built · 180 kW
Oct 2025 7.1 km away Road and street works within 1 km 2 permitted works running now or planned.
Standard Willowmead Close, Woking Utility asset works · BT · Give and take
Oct 2026 to Oct 2026 950 m away Minor Holyoake Crescent, Woking Highway repair and maintenance works · SURREY COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 1000 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2022 8.9 km away Pre-application application due December 2027 18.1 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 19.0 km away Decided decided Sept 2016 21.4 km away Decided decided Nov 2023 22.0 km away Pre-application application due March 2027 22.5 km away Pre-application
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Trumps Farm (AD) (anaerobic digestion, 6.0 km); Trumps Farm Landfill Scheme (landfill gas, 6.3 km); Chertsey Water Treatment Works (solar farm, 7.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.