What's changing near GU21 4RU
Within 2 km, around Woking Central in Woking. Building, planning, schools, transport, prices and crime.
529new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.9%like-for-like prices in Woking Central, 2024 → 2025 (council +2.2%)
+12%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
18 new homes completedflats · Apr 2026 – Jun 2026
Jun 2026
1.8 km away - New homes
54 new homes completedflats · Nov 2025 – Feb 2026
Feb 2026
1.5 km away - New homes
17 new homes completedflats · Dec 2025
Dec 2025
1.6 km away - New homes
98 new homes completedflats · Dec 2025
Dec 2025
1.0 km away - New homes
89 new homes completedflats · Dec 2025
Dec 2025
1.0 km away - New homes
60 new homes completedflats · Dec 2025
Dec 2025
1.0 km away - New homes
91 new homes completedflats · Dec 2025
Dec 2025
1.1 km away - New homes
88 new homes completedflats · Dec 2025
Dec 2025
1.1 km away - New homes
6 new homes completedflats · Mar 2025 – Aug 2025
Aug 2025
1.2 km away - New schoolApr 2020
1.6 km away - New schoolMar 2020
1.7 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
34homes extended 2021–2025, typically adding 46 m²
68since energy certificates began (2008)
1in GU21 4RU itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
27 planned, approved or being built and 3 running (7 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Kestrel Way - Solar PanelsApproved, not yet built · 1 MW
Mar 2024
850 m away - Battery storage
Electricty Sub Station, Wilders Close - Micro Energy StorageApproved, not yet built · 200 kW
Apr 2026
1.0 km away - Battery storage
Hollywood Quarter, Church Street East - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jan 2026
1.2 km away - Rooftop solar
Guildford Road - Solar ArrayApproved, not yet built · 270 kW
Aug 2021
1.3 km away - Rooftop solar
David Lloyd Leisure, Westfield Avenue - Solar PanelsApproved, not yet built
Jun 2023
2.2 km away - Rooftop solar
Mclaren Technology Centre, Chertsey Road - Solar PanelsApproved, not yet built · 3 MW
Nov 2025
3.1 km away - Rooftop solar
West Byfleet Consulting Rooms, Madeira Road - Solar panelsApproved, not yet built · 160 kW
Mar 2024
4.9 km away - Rooftop solar
Fullbrook School, Selsdon Road - Solar panelsApproved, not yet built · 180 kW
Jan 2024
5.2 km away - Battery storage
Lucas Green Road - Micro Energy Storage SystemPlanning application in · 200 kW
Aug 2024
5.5 km away - Rooftop solar
Big Yellow Byfleet, Oyster Lane - Solar PanelsApproved, not yet built · 180 kW
Oct 2025
6.9 km away
Road and street works within 1 km
4 permitted works running now or planned, 1 of them major.
- Major, planned
Kettlewell Close, WokingUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
850 m away - Standard
Parley Drive, WokingSection 50 · SURREY COUNTY COUNCIL · Two-way signals
Nov 2026 to Nov 2026
950 m away - Minor
Holyoake Crescent, WokingHighway repair and maintenance works · SURREY COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
500 m away - Minor
Wheatsheaf Close, WokingHighway repair and maintenance works · SURREY COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided May 2022
8.5 km away - Pre-applicationapplication due December 2027
18.5 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
19.4 km away - Decideddecided Sept 2016
22.1 km away - Pre-applicationapplication due March 2027
22.6 km away - Decideddecided Nov 2023
22.6 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Trumps Farm (AD) (anaerobic digestion, 6.5 km); Trumps Farm Landfill Scheme (landfill gas, 6.9 km); Chertsey Water Treatment Works (solar farm, 8.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.