Country England and Wales › Region South East › Council Surrey Heath › Neighbourhood Frimley Green › Postcode GU16 9AU What's changing near GU16 9AU Within 2 km, around Frimley Green in Surrey Heath. Building, planning, schools, transport, prices and crime.
121 new homes completed within 2 km, last 2 years
484 homes given permission on brownfield sites since 2021
-3.5% like-for-like prices in Frimley Green, 2024 → 2025 (council +0.7%)
+11% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 15 new homes completed 1 flats, 14 houses · Aug 2026
Sept 2026 1000 m away New homes 9 new homes completed 6 flats, 3 houses · Jan 2026 – Sep 2026
Sept 2026 1.0 km away New homes 6 new homes completed houses · Mar 2026 – Sep 2026
Sept 2026 950 m away New homes 12 new homes completed houses · Jun 2026 – Jul 2026
Jul 2026 1.9 km away New homes 8 new homes completed flats · May 2026
May 2026 1.0 km away New homes 6 new homes completed houses · Jan 2025 – Feb 2026
Feb 2026 1.7 km away New homes 8 new homes completed houses · May 2025 – Feb 2026
Feb 2026 1.5 km away New homes 36 new homes completed houses · Nov 2024 – Sep 2025
Sept 2025 1.6 km away Planning permission Sept 2024 900 m away Planning permission Oct 2022 1.5 km away 24 homes extended 2021–2025, typically adding 25 m²
34 since energy certificates began (2008)
1 in GU16 9AU itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 18 planned, approved or being built and 1 running (2 MW between them). Those within 5 km are on the map above.
Rooftop solar Chancerygate Way - Solar Panels Approved, not yet built · 300 kW
May 2024 1.7 km away Solar farm St Michaels Abbey, Farnborough Road - Solar Panels Approved, not yet built · 210 kW
Apr 2026 2.0 km away Rooftop solar Contra House, Oak Close - Solar Panels Planning application in · 350 kW
Jun 2026 3.1 km away Battery storage West Side Of France Hill Drive - Battery Energy Storage Approved, not yet built · 200 kW
Jul 2025 3.1 km away Rooftop solar Data Centre, Dennison House, Stanhope Road - Solar Panels Approved, not yet built · 1 MW
Jan 2025 3.4 km away Rooftop solar Gbc Uk, Glebeland Road - Solar Panels Planning application in · 240 kW
Mar 2026 3.4 km away Rooftop solar Invincible Road - Solar Panels Approved, not yet built · 150 kW
Jun 2023 3.5 km away Solar farm Templer Avenue - Solar Photovoltaic Panel Approved, not yet built · 230 kW
Dec 2022 3.9 km away Rooftop solar Farnborough International Exhibition Centre, Etps Road - Solar Panels Being built · 1 MW
Feb 2024 4.1 km away Rooftop solar Tesco Stores, Marshall Road - Solar Panels Approved, not yet built · 210 kW
Dec 2025 4.3 km away Road and street works within 1 km 6 permitted works running now or planned, 3 of them major.
Major Richmond Close Footpath, Camberley Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Sept 2026 to Oct 2026 800 m away Major Richmond Close, Camberley Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Sept 2026 to Oct 2026 800 m away Major Richmond Close, Camberley Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Sept 2026 to Oct 2026 800 m away Standard Frimley Green Road, Camberley New service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Some carriageway incursion
Oct 2026 to Oct 2026 800 m away Standard Frimley Green Road, Camberley New service connection · SOUTH EAST WATER · Two-way signals
Oct 2026 to Oct 2026 800 m away Minor Henley Drive, Camberley Utility repair and maintenance works · SOUTH EAST WATER · No carriageway incursion
Oct 2026 to Oct 2026 650 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2022 19.5 km away Decided decided Sept 2016 19.7 km away Decided decided Oct 2020 21.2 km away Decided decided Nov 2023 24.7 km away Pre-application application due December 2027 26.3 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 26.4 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.