What's changing near GU16 6JG
Within 2 km, around Mytchett & Frith Hill in Surrey Heath. Building, planning, schools, transport, prices and crime.
215new homes completed within 2 km, last 2 years
364homes given permission on brownfield sites since 2021
+1.4%like-for-like prices in Mytchett & Frith Hill, 2024 → 2025 (council +0.7%)
-14%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
22 new homes completed21 flats, 1 houses · Dec 2024 – Jul 2026
Jul 2026
1.8 km away - New homes
6 new homes completedhouses · Jan 2025 – Feb 2026
Feb 2026
1.4 km away - New homes
77 new homes completedflats · Oct 2024 – Feb 2026
Feb 2026
1.8 km away - New homes
8 new homes completedhouses · May 2025 – Feb 2026
Feb 2026
1.6 km away - Planning permissionOct 2025
1.8 km away - New homes
36 new homes completedhouses · Nov 2024 – Sep 2025
Sept 2025
1.6 km away - New homes
31 new homes completedflats · Aug 2025
Aug 2025
1.7 km away - New homes
18 new homes completedflats · Jun 2025
Jun 2025
1.9 km away - Planning permissionDec 2024
1.7 km away - Planning permission
15homes extended 2021–2025, typically adding 36 m²
38since energy certificates began (2008)
1in GU16 6JG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
103hours of spills in 2025 between them (typical neighbourhood: about 36)
9spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
20 planned, approved or being built and 2 running (3 MW between them). Those within 5 km are on the map above.
- Solar farm
St Michaels Abbey, Farnborough Road - Solar PanelsApproved, not yet built · 210 kW
Apr 2026
1.4 km away - Rooftop solar
Invincible Road - Solar PanelsApproved, not yet built · 150 kW
Jun 2023
2.5 km away - Rooftop solar
Farnborough International Exhibition Centre, Etps Road - Solar PanelsBeing built · 1 MW
Feb 2024
2.5 km away - Rooftop solar
Chancerygate Way - Solar PanelsApproved, not yet built · 300 kW
May 2024
2.7 km away - Solar farm
Templer Avenue - Solar Photovoltaic PanelApproved, not yet built · 230 kW
Dec 2022
2.8 km away - Rooftop solar
Contra House, Oak Close - Solar PanelsPlanning application in · 350 kW
Jun 2026
4.6 km away - Battery storage
West Side Of France Hill Drive - Battery Energy StorageApproved, not yet built · 200 kW
Jul 2025
5.0 km away - Rooftop solar
Gbc Uk, Glebeland Road - Solar PanelsPlanning application in · 240 kW
Mar 2026
5.0 km away - Rooftop solar
Data Centre, Dennison House, Stanhope Road - Solar PanelsApproved, not yet built · 1 MW
Jan 2025
5.1 km away - Rooftop solar
Tesco Stores, Marshall Road - Solar PanelsApproved, not yet built · 210 kW
Dec 2025
5.8 km away
Road and street works within 1 km
6 permitted works running now or planned, 4 of them major.
- Major, planned
Coleford Bridge Road, CamberleyUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Jul 2027 to Aug 2027
200 m away - Major
Coleford Bridge Road, CamberleyUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Jul 2027 to Aug 2027
200 m away - Major, planned
Hamesmoor Road, CamberleyUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Jul 2028 to Aug 2028
250 m away - Major
Hamesmoor Road, CamberleyUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Jul 2028 to Aug 2028
250 m away - Standard
Coleford Bridge Road, CamberleyNew service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Two-way signals
Oct 2026 to Oct 2026
150 m away - Minor
Blackwater Valley Road, FarnboroughHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026
550 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2020
19.7 km away - Decideddecided May 2022
19.8 km away - Decideddecided Sept 2016
21.7 km away - Decideddecided Nov 2023
26.7 km away - Pre-applicationapplication due December 2027
27.7 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
28.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Farnborough Airport - Solar Panels (rooftop solar, 3.4 km); Runfold Landfill (landfill gas, 8.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.