Country England and Wales › Region South East › Council Surrey Heath › Neighbourhood Mytchett & Frith Hill › Postcode GU16 6JE What's changing near GU16 6JE Within 2 km, around Mytchett & Frith Hill in Surrey Heath. Building, planning, schools, transport, prices and crime.
215 new homes completed within 2 km, last 2 years
364 homes given permission on brownfield sites since 2021
+1.4% like-for-like prices in Mytchett & Frith Hill, 2024 → 2025 (council +0.7%)
-14% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 22 new homes completed 21 flats, 1 houses · Dec 2024 – Jul 2026
Jul 2026 1.7 km away New homes 6 new homes completed houses · Jan 2025 – Feb 2026
Feb 2026 1.5 km away New homes 77 new homes completed flats · Oct 2024 – Feb 2026
Feb 2026 1.6 km away New homes 8 new homes completed houses · May 2025 – Feb 2026
Feb 2026 1.7 km away Planning permission Oct 2025 1.6 km away New homes 36 new homes completed houses · Nov 2024 – Sep 2025
Sept 2025 1.7 km away New homes 31 new homes completed flats · Aug 2025
Aug 2025 1.5 km away New homes 18 new homes completed flats · Jun 2025
Jun 2025 1.6 km away Planning permission Dec 2024 1.5 km away Planning permission 7 homes extended 2021–2025, typically adding 36 m²
18 since energy certificates began (2008)
1 in GU16 6JE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
103 hours of spills in 2025 between them (typical neighbourhood: about 36)
9 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 21 planned, approved or being built and 2 running (3 MW between them). Those within 5 km are on the map above.
Solar farm St Michaels Abbey, Farnborough Road - Solar Panels Approved, not yet built · 210 kW
Apr 2026 1.2 km away Rooftop solar Invincible Road - Solar Panels Approved, not yet built · 150 kW
Jun 2023 2.3 km away Rooftop solar Farnborough International Exhibition Centre, Etps Road - Solar Panels Being built · 1 MW
Feb 2024 2.5 km away Rooftop solar Chancerygate Way - Solar Panels Approved, not yet built · 300 kW
May 2024 2.5 km away Solar farm Templer Avenue - Solar Photovoltaic Panel Approved, not yet built · 230 kW
Dec 2022 2.7 km away Rooftop solar Contra House, Oak Close - Solar Panels Planning application in · 350 kW
Jun 2026 4.4 km away Rooftop solar Gbc Uk, Glebeland Road - Solar Panels Planning application in · 240 kW
Mar 2026 4.8 km away Battery storage West Side Of France Hill Drive - Battery Energy Storage Approved, not yet built · 200 kW
Jul 2025 4.8 km away Rooftop solar Data Centre, Dennison House, Stanhope Road - Solar Panels Approved, not yet built · 1 MW
Jan 2025 4.9 km away Rooftop solar Tesco Stores, Marshall Road - Solar Panels Approved, not yet built · 210 kW
Dec 2025 5.6 km away Road and street works within 1 km 6 permitted works running now or planned, 4 of them major.
Major, planned Hamesmoor Road, Camberley Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Jul 2028 to Aug 2028 100 m away Major Hamesmoor Road, Camberley Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Jul 2028 to Aug 2028 100 m away Major, planned Coleford Bridge Road, Camberley Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Jul 2027 to Aug 2027 350 m away Major Coleford Bridge Road, Camberley Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Jul 2027 to Aug 2027 350 m away Standard Coleford Bridge Road, Camberley New service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Two-way signals
Oct 2026 to Oct 2026 300 m away Minor Blackwater Valley Road, Farnborough Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026 450 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2020 19.7 km away Decided decided May 2022 19.9 km away Decided decided Sept 2016 21.6 km away Decided decided Nov 2023 26.6 km away Pre-application application due December 2027 27.8 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 28.0 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Farnborough Airport - Solar Panels (rooftop solar, 3.2 km); Runfold Landfill (landfill gas, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.