Country England and Wales › Region South East › Council Surrey Heath › Neighbourhood Camberley West › Postcode GU15 3AE What's changing near GU15 3AE Within 2 km, around Camberley West in Surrey Heath. Building, planning, schools, transport, prices and crime.
77 new homes completed within 2 km, last 2 years
145 homes given permission on brownfield sites since 2021
-1.7% like-for-like prices in Camberley West, 2024 → 2025 (council +0.7%)
+11% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 28 new homes completed flats · Jan 2026
Jan 2026 1.4 km away New homes 30 new homes completed flats · Nov 2025
Nov 2025 1.1 km away New homes 7 new homes completed flats · May 2025
May 2025 650 m away Planning permission Permission for 8 homes Car Park Adj Meadows Business Park Station Approach Blackwater Camberley (full planning permission) Jul 2024 1.4 km away New school New school: Bohunt Farnborough Academy sponsor led, secondary
Jan 2024 1.8 km away Planning permission Jun 2023 950 m away Planning permission Jan 2023 1.1 km away Planning permission Sept 2021 1.6 km away Planning permission 17 homes extended 2021–2025, typically adding 37 m²
45 since energy certificates began (2008)
2 in GU15 3AE itself
Extended certificate 2026 Extended certificate 2015 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
69 hours of spills in 2025 between them (typical neighbourhood: about 36)
7 spill events counted
Thames Water Camberley into Blackwater 7 spills, 69 hours in 2025
650 m away Thames Water N/A into Not Applicable 0 spills, 0 hours in 2025
400 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 17 planned, approved or being built and 2 running (8 MW between them). Those within 5 km are on the map above.
Rooftop solar Data Centre, Dennison House, Stanhope Road - Solar Panels Approved, not yet built · 1 MW
Jan 2025 500 m away Rooftop solar Gbc Uk, Glebeland Road - Solar Panels Planning application in · 240 kW
Mar 2026 600 m away Battery storage West Side Of France Hill Drive - Battery Energy Storage Approved, not yet built · 200 kW
Jul 2025 650 m away Rooftop solar Contra House, Oak Close - Solar Panels Planning application in · 350 kW
Jun 2026 650 m away Rooftop solar Tesco Stores, Marshall Road - Solar Panels Approved, not yet built · 210 kW
Dec 2025 1.4 km away Rooftop solar Chancerygate Way - Solar Panels Approved, not yet built · 300 kW
May 2024 2.1 km away Solar farm St Michaels Abbey, Farnborough Road - Solar Panels Approved, not yet built · 210 kW
Apr 2026 3.8 km away Rooftop solar Edgbarrow School, Grant Road - Solar Panels Approved, not yet built · 200 kW
Jun 2026 4.4 km away Rooftop solar The Paddock Centre, Joshua Jebb Way - Solar Panels Approved, not yet built · 190 kW
Jan 2025 4.7 km away Rooftop solar Broadmoor Hospital, Lower Broadmoor Road - Solar Photovoltaic Panels Approved, not yet built · 430 kW
Feb 2026 4.7 km away Road and street works within 1 km 5 permitted works running now or planned, 3 of them major.
Major, planned Gordon Avenue, Camberley New service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Road closure
Oct 2026 to Oct 2026 500 m away Major Gordon Avenue, Camberley New service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Road closure
Oct 2026 to Oct 2026 500 m away Major Heatherdale Road, Camberley Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Oct 2026 to Oct 2026 800 m away Standard Glebeland Road, Camberley Utility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Give and take
Dec 2026 to Dec 2026 650 m away Standard Rivermead Road, Camberley Utility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Some carriageway incursion
Oct 2026 to Oct 2026 950 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Sept 2016 17.5 km away Decided decided May 2022 21.4 km away Decided decided Oct 2020 21.7 km away Decided decided Nov 2023 23.3 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 26.3 km away Pre-application application due December 2027 26.4 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: Farnborough Airport - Solar Panels (rooftop solar, 5.4 km); Taplins Farm solar park (solar farm, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.