Country England and Wales › Region South East › Council Rushmoor › Neighbourhood Farnborough Town › Postcode GU14 8LD What's changing near GU14 8LD Within 2 km, around Farnborough Town in Rushmoor. Building, planning, schools, transport, prices and crime.
157 new homes completed within 2 km, last 2 years
139 homes given permission on brownfield sites since 2021
+2.3% like-for-like prices in Farnborough Town, 2024 → 2025 (council +2.8%)
-9% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 22 new homes completed 21 flats, 1 houses · Dec 2024 – Jul 2026
Jul 2026 1.4 km away New homes 77 new homes completed flats · Oct 2024 – Feb 2026
Feb 2026 1.4 km away Planning permission Oct 2025 800 m away New homes 31 new homes completed flats · Aug 2025
Aug 2025 900 m away New homes 18 new homes completed flats · Jun 2025
Jun 2025 800 m away Planning permission Dec 2024 1.1 km away New school New school: Bohunt Farnborough Academy sponsor led, secondary
Jan 2024 1.8 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
12 homes extended 2021–2025, typically adding 22 m²
29 since energy certificates began (2008)
1 in GU14 8LD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 24 planned, approved or being built and 4 running (14 MW between them). Those within 5 km are on the map above.
Solar farm St Michaels Abbey, Farnborough Road - Solar Panels Approved, not yet built · 210 kW
Apr 2026 1000 m away Rooftop solar Invincible Road - Solar Panels Approved, not yet built · 150 kW
Jun 2023 1.3 km away Rooftop solar Chancerygate Way - Solar Panels Approved, not yet built · 300 kW
May 2024 1.5 km away Solar farm Templer Avenue - Solar Photovoltaic Panel Approved, not yet built · 230 kW
Dec 2022 1.8 km away Rooftop solar Farnborough International Exhibition Centre, Etps Road - Solar Panels Being built · 1 MW
Feb 2024 2.4 km away Rooftop solar Contra House, Oak Close - Solar Panels Planning application in · 350 kW
Jun 2026 3.1 km away Rooftop solar Gbc Uk, Glebeland Road - Solar Panels Planning application in · 240 kW
Mar 2026 3.5 km away Rooftop solar Data Centre, Dennison House, Stanhope Road - Solar Panels Approved, not yet built · 1 MW
Jan 2025 3.7 km away Battery storage West Side Of France Hill Drive - Battery Energy Storage Approved, not yet built · 200 kW
Jul 2025 4.0 km away Rooftop solar Tesco Stores, Marshall Road - Solar Panels Approved, not yet built · 210 kW
Dec 2025 4.2 km away Road and street works within 1 km 7 permitted works running now or planned, 3 of them major.
Major Highfield Path, Farnborough Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Jul 2026 to Oct 2026 700 m away Major, planned Cove Road, Farnborough Utility repair and maintenance works · THAMES WATER · Road closure
Dec 2026 to Dec 2026 1000 m away Major Cove Road, Farnborough Utility repair and maintenance works · THAMES WATER · Road closure
Nov 2026 to Nov 2026 1000 m away Standard Mayfield Road, Farnborough Utility asset works · HUTCHISON 3G LTD · Multi-way signals
Dec 2026 to Dec 2026 750 m away Standard Prospect Avenue, Farnborough Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Some carriageway incursion
Feb 2027 to Feb 2027 800 m away Standard Farnborough Road, Farnborough New service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Lane closure
Oct 2026 to Oct 2026 950 m away Minor Credon Close, Farnborough Utility repair and maintenance works · SOUTH EAST WATER · No carriageway incursion
Oct 2026 to Oct 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2020 18.8 km away Decided decided Sept 2016 20.9 km away Decided decided May 2022 21.9 km away Decided decided Nov 2023 26.6 km away Pre-application application due December 2027 28.7 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 28.8 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Farnborough Airport - Solar Panels (rooftop solar, 2.1 km); Hungerford Farm (solar farm, 8.5 km); Taplins Farm solar park (solar farm, 8.5 km); Runfold Landfill (landfill gas, 9.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.