Country England and Wales › Region South East › Council Rushmoor › Neighbourhood Farnborough Hill › Postcode GU14 8JA What's changing near GU14 8JA Within 2 km, around Farnborough Hill in Rushmoor. Building, planning, schools, transport, prices and crime.
99 new homes completed within 2 km, last 2 years
542 homes given permission on brownfield sites since 2021
+2.6% like-for-like prices in Farnborough Hill, 2024 → 2025 (council +2.8%)
+5% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 15 new homes completed 1 flats, 14 houses · Aug 2026
Sept 2026 1.6 km away New homes 9 new homes completed 6 flats, 3 houses · Jan 2026 – Sep 2026
Sept 2026 1.7 km away New homes 6 new homes completed houses · Mar 2026 – Sep 2026
Sept 2026 1.7 km away New homes 8 new homes completed flats · May 2026
May 2026 850 m away Planning permission Oct 2025 1.5 km away New homes 31 new homes completed flats · Aug 2025
Aug 2025 1.5 km away New homes 18 new homes completed flats · Jun 2025
Jun 2025 1.6 km away Planning permission Dec 2024 1.9 km away Planning permission Sept 2024 1.6 km away 9 homes extended 2021–2025, typically adding 19 m²
19 since energy certificates began (2008)
2 in GU14 8JA itself
Extended certificate 2025 Extended certificate 2014 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 18 planned, approved or being built and 4 running (14 MW between them). Those within 5 km are on the map above.
Rooftop solar Chancerygate Way - Solar Panels Approved, not yet built · 300 kW
May 2024 500 m away Solar farm St Michaels Abbey, Farnborough Road - Solar Panels Approved, not yet built · 210 kW
Apr 2026 1.2 km away Rooftop solar Invincible Road - Solar Panels Approved, not yet built · 150 kW
Jun 2023 2.4 km away Rooftop solar Contra House, Oak Close - Solar Panels Planning application in · 350 kW
Jun 2026 2.4 km away Rooftop solar Gbc Uk, Glebeland Road - Solar Panels Planning application in · 240 kW
Mar 2026 2.8 km away Solar farm Templer Avenue - Solar Photovoltaic Panel Approved, not yet built · 230 kW
Dec 2022 2.9 km away Rooftop solar Data Centre, Dennison House, Stanhope Road - Solar Panels Approved, not yet built · 1 MW
Jan 2025 3.0 km away Battery storage West Side Of France Hill Drive - Battery Energy Storage Approved, not yet built · 200 kW
Jul 2025 3.1 km away Rooftop solar Farnborough International Exhibition Centre, Etps Road - Solar Panels Being built · 1 MW
Feb 2024 3.3 km away Rooftop solar Tesco Stores, Marshall Road - Solar Panels Approved, not yet built · 210 kW
Dec 2025 3.6 km away Road and street works within 1 km 10 permitted works running now or planned, 5 of them major.
Major Frimley By-Pass, Camberley Highway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Nov 2026 to Jan 2027 550 m away Major Blackwater Valley Road, Camberley Highway repair and maintenance works · SURREY COUNTY COUNCIL · Lane closure
Nov 2026 to Jan 2027 600 m away Major Blackwater Valley Road, Camberley Optional permit (no fee) e.g. for traffic management etc · NATIONAL HIGHWAYS · Lane closure
Jan 2027 to Feb 2027 800 m away Major Chapel Street, Farnborough Utility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · No carriageway incursion
Oct 2026 to Oct 2026 900 m away Major Frimley By-Pass, Camberley Utility asset works · HUTCHISON 3G LTD · Road closure
Oct 2026 to Oct 2026 1000 m away Standard Prospect Avenue, Farnborough Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Some carriageway incursion
Feb 2027 to Feb 2027 400 m away Standard Hawley Lane, Farnborough Utility asset works · HUTCHISON 3G LTD · Multi-way signals
Nov 2026 to Nov 2026 400 m away Minor Blackwater Valley Road, Farnborough Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026 550 m away Minor Lyon Way, Camberley Highway repair and maintenance works · SURREY COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 950 m away Major infrastructure projects within 30 km Decided decided Oct 2020 20.0 km away Decided decided Sept 2016 20.0 km away Decided decided May 2022 21.0 km away Decided decided Nov 2023 25.5 km away Pre-application application due December 2027 27.6 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 27.7 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Farnborough Airport - Solar Panels (rooftop solar, 3.2 km); Taplins Farm solar park (solar farm, 9.4 km); Hungerford Farm (solar farm, 9.5 km); Runfold Landfill (landfill gas, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.