Country England and Wales › Region South East › Council Rushmoor › Neighbourhood South Farnborough & North Camp › Postcode GU14 6QT What's changing near GU14 6QT Within 2 km, around South Farnborough & North Camp in Rushmoor. Building, planning, schools, transport, prices and crime.
253 new homes completed within 2 km, last 2 years
148 homes given permission on brownfield sites since 2021
-1.1% like-for-like prices in South Farnborough & North Camp, 2024 → 2025 (council +2.8%)
-9% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 5 new homes completed houses · Jun 2026 – Sep 2026
Sept 2026 2.0 km away New homes 22 new homes completed 21 flats, 1 houses · Dec 2024 – Jul 2026
Jul 2026 1.0 km away New homes 9 new homes completed houses · Apr 2026 – Jun 2026
Jun 2026 2.0 km away New homes 27 new homes completed 9 flats, 18 houses · May 2025 – Mar 2026
Mar 2026 1.8 km away New homes 77 new homes completed flats · Oct 2024 – Feb 2026
Feb 2026 1000 m away New homes 16 new homes completed 4 flats, 12 houses · May 2025 – Nov 2025
Nov 2025 1.9 km away Planning permission Nov 2025 400 m away Planning permission Oct 2025 1.6 km away New homes 31 new homes completed flats · Aug 2025
Aug 2025 1.5 km away New homes 18 new homes completed
21 homes extended 2021–2025, typically adding 32 m²
44 since energy certificates began (2008)
2 in GU14 6QT itself
Extended certificate 2020 Extended certificate 2019 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
103 hours of spills in 2025 between them (typical neighbourhood: about 36)
9 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 23 planned, approved or being built and 4 running (14 MW between them). Those within 5 km are on the map above.
Rooftop solar Farnborough International Exhibition Centre, Etps Road - Solar Panels Being built · 1 MW
Feb 2024 900 m away Rooftop solar Invincible Road - Solar Panels Approved, not yet built · 150 kW
Jun 2023 1.4 km away Solar farm Templer Avenue - Solar Photovoltaic Panel Approved, not yet built · 230 kW
Dec 2022 1.5 km away Solar farm St Michaels Abbey, Farnborough Road - Solar Panels Approved, not yet built · 210 kW
Apr 2026 1.8 km away Rooftop solar Chancerygate Way - Solar Panels Approved, not yet built · 300 kW
May 2024 3.5 km away Rooftop solar Contra House, Oak Close - Solar Panels Planning application in · 350 kW
Jun 2026 5.3 km away Rooftop solar Gbc Uk, Glebeland Road - Solar Panels Planning application in · 240 kW
Mar 2026 5.8 km away Rooftop solar Data Centre, Dennison House, Stanhope Road - Solar Panels Approved, not yet built · 1 MW
Jan 2025 5.9 km away Battery storage West Side Of France Hill Drive - Battery Energy Storage Approved, not yet built · 200 kW
Jul 2025 6.0 km away Rooftop solar David Lloyd Leisure Club, Wilkinson Way - Solar PV Panels Approved, not yet built · 330 kW
Sept 2023 6.4 km away Road and street works within 1 km 6 permitted works running now or planned, 6 of them major.
Major, planned Sherborne Road, Farnborough Highway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 300 m away Major Sherborne Road, Farnborough Highway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 300 m away Major, planned Cross Street, Farnborough Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Jan 2027 to Mar 2027 500 m away Major, planned Alma Square, Farnborough Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Jan 2027 to Mar 2027 500 m away Major, planned Farnborough Road, Farnborough New service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Road closure
Nov 2026 to Nov 2026 750 m away Major Farnborough Road, Farnborough New service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Road closure
Nov 2026 to Nov 2026 750 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2020 18.0 km away Decided decided May 2022 21.1 km away Decided decided Sept 2016 23.0 km away Decided decided Nov 2023 28.2 km away Pre-application application due December 2027 29.4 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 29.7 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Farnborough Airport - Solar Panels (rooftop solar, 2.1 km); Runfold Landfill (landfill gas, 7.0 km); Hungerford Farm (solar farm, 9.3 km); Taplins Farm solar park (solar farm, 9.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.