What's changing near GU14 0BL
Within 2 km, around Farnborough Town in Rushmoor. Building, planning, schools, transport, prices and crime.
160new homes completed within 2 km, last 2 years
148homes given permission on brownfield sites since 2021
+2.3%like-for-like prices in Farnborough Town, 2024 → 2025 (council +2.8%)
-9%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
22 new homes completed21 flats, 1 houses · Dec 2024 – Jul 2026
Jul 2026
900 m away - New homes
77 new homes completedflats · Oct 2024 – Feb 2026
Feb 2026
900 m away - Planning permissionNov 2025
1.8 km away - Planning permissionOct 2025
1.0 km away - New homes
31 new homes completedflats · Aug 2025
Aug 2025
1.1 km away - New homes
18 new homes completedflats · Jun 2025
Jun 2025
900 m away - New homes
7 new homes completedflats · Feb 2025
Feb 2025
1.8 km away - Planning permissionDec 2024
1.0 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 10 postcodes nearby had new homes completed in the last two years.
9homes extended 2021–2025, typically adding 25 m²
19since energy certificates began (2008)
0in GU14 0BL itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
23 planned, approved or being built and 4 running (14 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Invincible Road - Solar PanelsApproved, not yet built · 150 kW
Jun 2023
300 m away - Solar farm
Templer Avenue - Solar Photovoltaic PanelApproved, not yet built · 230 kW
Dec 2022
550 m away - Rooftop solar
Farnborough International Exhibition Centre, Etps Road - Solar PanelsBeing built · 1 MW
Feb 2024
1.4 km away - Solar farm
St Michaels Abbey, Farnborough Road - Solar PanelsApproved, not yet built · 210 kW
Apr 2026
1.6 km away - Rooftop solar
Chancerygate Way - Solar PanelsApproved, not yet built · 300 kW
May 2024
2.7 km away - Rooftop solar
Contra House, Oak Close - Solar PanelsPlanning application in · 350 kW
Jun 2026
4.2 km away - Rooftop solar
Gbc Uk, Glebeland Road - Solar PanelsPlanning application in · 240 kW
Mar 2026
4.7 km away - Rooftop solar
Data Centre, Dennison House, Stanhope Road - Solar PanelsApproved, not yet built · 1 MW
Jan 2025
4.9 km away - Battery storage
West Side Of France Hill Drive - Battery Energy StorageApproved, not yet built · 200 kW
Jul 2025
5.2 km away - Rooftop solar
Tesco Stores, Marshall Road - Solar PanelsApproved, not yet built · 210 kW
Dec 2025
5.3 km away
Road and street works within 1 km
7 permitted works running now or planned, 6 of them major.
- Major, planned
Invincible Road, FarnboroughHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Dec 2026
300 m away - Major
Invincible Road, FarnboroughHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Dec 2026
300 m away - Major, planned
Cove Road, FarnboroughUtility repair and maintenance works · THAMES WATER · Road closure
Dec 2026 to Dec 2026
450 m away - Major
Cove Road, FarnboroughUtility repair and maintenance works · THAMES WATER · Road closure
Nov 2026 to Nov 2026
450 m away - Major
Highfield Path, FarnboroughUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Jul 2026 to Oct 2026
700 m away - Major
Queensmead, FarnboroughUtility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · No carriageway incursion
Nov 2026 to Dec 2026
900 m away - Standard
Invincible Road, FarnboroughHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Give and take
Oct 2026 to Oct 2026
350 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2020
17.6 km away - Decideddecided Sept 2016
22.1 km away - Decideddecided May 2022
22.4 km away - Decideddecided Nov 2023
27.8 km away - Pre-applicationapplication due December 2027
29.8 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
30.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Farnborough Airport - Solar Panels (rooftop solar, 850 m); Hungerford Farm (solar farm, 7.9 km); Runfold Landfill (landfill gas, 7.9 km); Taplins Farm solar park (solar farm, 8.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.