Country England and Wales › Region South East › Council Rushmoor › Neighbourhood Aldershot Park › Postcode GU12 4EE What's changing near GU12 4EE Within 2 km, around Aldershot Park in Rushmoor. Building, planning, schools, transport, prices and crime.
189 new homes completed within 2 km, last 2 years
38 homes given permission on brownfield sites since 2021
+4.9% like-for-like prices in Aldershot Park, 2024 → 2025 (council +2.8%)
+13% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 28 new homes completed flats · Jul 2026
Jul 2026 1.3 km away New homes 28 new homes completed flats · Jul 2026
Jul 2026 1.3 km away New school Feb 2026 2.0 km away Planning permission Dec 2025 1.8 km away New homes 8 new homes completed houses · Apr 2025 – Nov 2025
Nov 2025 2.0 km away New homes 6 new homes completed houses · Nov 2025
Nov 2025 1.1 km away New homes 8 new homes completed flats · Oct 2025
Oct 2025 1.1 km away New homes 15 new homes completed flats · Oct 2025
Oct 2025 1.3 km away New homes 9 new homes completed houses · Jul 2025 – Sep 2025
Sept 2025 1.3 km away New homes 8 new homes completed flats · Sep 2025
Sept 2025 1.8 km away New homes 18 new homes completed
32 homes extended 2021–2025, typically adding 27 m²
51 since energy certificates began (2008)
0 in GU12 4EE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
46 hours of spills in 2025 between them (typical neighbourhood: about 36)
11 spill events counted
Thames Water Aldershot Town Wwtw into Blackwater River 9 spills, 38 hours in 2025
1.0 km away Thames Water N/A into Not Applicable 2 spills, 8 hours in 2025
1.0 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 20 planned, approved or being built and 4 running (11 MW between them). Those within 5 km are on the map above.
Rooftop solar David Lloyd Leisure Club, Wilkinson Way - Solar PV Panels Approved, not yet built · 330 kW
Sept 2023 2.7 km away Rooftop solar Kinetrol Manufacturing,Farnham Trading Estate - Solar Panels Planning application in · 240 kW
Oct 2022 3.0 km away Rooftop solar Farnborough International Exhibition Centre, Etps Road - Solar Panels Being built · 1 MW
Feb 2024 4.3 km away Rooftop solar Brightwells Road - Solar Panels Approved, not yet built · 330 kW
Nov 2022 4.6 km away Battery storage University For The Creative Arts, Falkner Road - ASHP & Battery Storage Approved, not yet built
Mar 2024 5.0 km away Rooftop solar University For The Creative Arts, Falkner Road - Solar PV Panels Approved, not yet built · 570 kW
Sept 2023 5.0 km away Solar farm Templer Avenue - Solar Photovoltaic Panel Approved, not yet built · 230 kW
Dec 2022 5.1 km away Rooftop solar Invincible Road - Solar Panels Approved, not yet built · 150 kW
Jun 2023 5.4 km away Solar farm St Michaels Abbey, Farnborough Road - Solar Panels Approved, not yet built · 210 kW
Apr 2026 6.3 km away Rooftop solar Chancerygate Way - Solar Panels Approved, not yet built · 300 kW
May 2024 8.0 km away Road and street works within 1 km 2 permitted works running now or planned.
Standard Lower Farnham Road, Aldershot Works for road purposes · HAMPSHIRE COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 150 m away Standard Gloucester Road, Aldershot Works for road purposes · HAMPSHIRE COUNTY COUNCIL · Stop/go boards
Oct 2026 to Oct 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2020 15.4 km away Decided decided May 2022 22.4 km away Decided decided Sept 2016 27.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Runfold Landfill (landfill gas, 2.7 km); Farnborough Airport - Solar Panels (rooftop solar, 5.2 km); Farnham Landfill (landfill gas, 7.6 km); Marsh House Solar Park (solar farm, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.